How to bid in this country: portals, deadlines, thresholds →
ZP/CZD/121/26 Modernisation and adaptation of the premises for the gamma camera at the Institute ‘Monument – Children’s Health Centre’ in the ‘design and build’ mode
ZP/CZD/121/26 Modernizacja i adaptacja pomieszczeń na potrzeby gammakamery w Instytucie „Pomnik – Centrum Zdrowia Dziecka” w trybie „zaprojektuj i wybuduj” — original title
Your path to submission
- Deadline: 3 November at 08:55 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject-matter of the contract is the modernisation and adaptation of the premises for the gamma camera at the ‘Memorial – Children’s Health Centre’ Institute in ‘design and build’ mode. The detailed description of the subject-matter of the contract is contained in the Functional and Utility Programme in a separate file entitled: 121-26 PFU Annex 1 to the ToR and its annexes, the Functional and Utility Programme hereinafter referred to as the PFU, which is the base material for the implementation of the contract entitled ‘Modernisation and adaptation of rooms for the needs of the gamma camera at the Institute ‘Monument – Children’s Health Centre’ in the ‘design and build’ mode. PFU concerns the design and execution of construction and arrangement works of rooms, including the execution of full design documentation for the above scope of works, obtaining the necessary permits (if…
Show full description
… required), and conducting the acceptance of works. The provisions referred to in this PFU should be applied in accordance with the current legal status, i.e. together with any changes made on the date of submission of the offer. Any indication in the PFU of a standard, technical specification, technical reference system, trademark, manufacturer or ownership solution should be understood in accordance with the provisions of the Public Procurement Law, in particular with the acceptance of equivalent solutions. Where reference is made to standards, the wording must be understood as ‘or equivalent’ and equivalence must be demonstrated by the Contractor by appropriate means of proof. The names of existing IPCZD systems indicated in the PFU are used to describe the state of existing and required interoperability. PFU determines the scope of the contract and is the basis for the calculation of the costs of the contract and the establishment of a flat-rate offer price for the comprehensive implementation of the task including: Development of design documentation necessary for the execution of construction works, including the development of a construction project (if required), executive documentation and technical specifications for the execution and acceptance of construction works in accordance with applicable regulations and requirements for the acceptance of premises by the State Administration Bodies, including: SANEPID, UDT (if required)., obtaining on behalf of the Ordering Party appropriate permits, expert opinions, opinions and arrangements necessary for the implementation of the investment, and if necessary, obtaining on behalf of the Ordering Party appropriate consents for derogations from technical and construction regulations, Performance of construction, demolition, and assembly, installation and finishing works related to the task in question along with technological start-up and commissioning, complex and complete equipment of premises along with furniture and equipment, in accordance with the developed design and requirements of the Ordering Party, delivery and assembly of white assembly along with fittings and accessories, in accordance with the developed design and technology, execution of the necessary instructions and training of the Ordering Party's staff. The contractor is obliged to develop the project in a way that takes into account all guidelines regarding the required functionality of groups of rooms (according to their type and purpose) while maintaining the relevant, applicable requirements set out in the building regulations. Design documentation at each stage must be agreed with the Ordering Party. The Contractor must: obtaining at its own expense materials and studies necessary for the execution of design documentation and carrying out construction works (e.g. technical opinions on the condition of the structure, technical expertise, etc.); 5 | S t r o n a obtaining in the name and on behalf of the Ordering Party all the necessary permits, arrangements, administrative decisions necessary to perform the entire investment task in the competent offices and incurring the related costs; to develop the necessary inventories, construction projects (if required) and executive projects in accordance with the current provisions of the construction law and technical conditions, Polish standards and in accordance with the
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (22 awards, most recently November 2025) — by that rhythm the next award was due around January 2026. The last award went to Rembud Sp. z o.o.n = 22
- The median procedure drew 2 bids (1,494 procedures with a bid count); 41% ended with a single bidder. Sector: median 5 bids.n = 1,494
- 44% of the bids received came from small and medium-sized enterprises (998 procedures with a bid mix). Sector: 84%.n = 998
- 47% of this buyer's awards went to companies that had already won here before (2,279 awards since 2015, spread over 646 companies). 53% went to new names.n = 2,279 awards since 2015
- 9% of awards went to companies from abroad (2,279 awards with a known winner country). Sector average: 0%.n = 2,279
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Salus International Spółka z ograniczoną odpowiedzialnością | 36 | 2024–2026 |
| URTICA Sp.z o.o. | 36 | 2023–2026 |
| Bialmed Sp. z o. o. | 35 | 2024–2026 |
| Asclepios S.A. | 35 | 2024–2026 |
| NEUCA S.A. | 31 | 2015–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 7 completed awards — not a statement about this procedure.)
This procedure allows 25 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now