Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Preparation of the design documentation for the amendment of the building permit decision concerning the conversion of the ground floor premises into a staff canteen in the building at ul. Kolska 12 in Warsaw

Opracowanie dokumentacji projektowej na potrzeby zmiany decyzji o pozwoleniu na budowę dotyczącej przebudowy pomieszczeń parteru na kantynę pracowniczą w budynku przy ul. Kolskiej 12 w Warszawie — original title

PLPoland · WarszawaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 9 November at 11:00 — 8 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is the preparation of project documentation for the purpose of conducting the procedure entitled: ‘Amendment of the building permit decision concerning the conversion of the ground floor premises into a staff canteen in the office building at ul. Kolska 12 (Official Gazette Nos 3, 4, 5/1 and 5/2 of 6-03-06) in Warsaw, together with the administrative procedure for amending building permit decision No 149/N/2016. The implementation of the task will be divided into the following stages: • Stage I - Execution of two variants of the architectural concept containing functional views of rooms. The Contractor shall present them to the Ordering Party for selection. The chosen concept will form the basis for the development of multi-discipline design documentation necessary to obtain a decision to change the building permit. • Stage II - Execution of a multi-discipline…

Show full description

… architectural and construction project constituting the basis for obtaining by the Contractor, acting on behalf of the Contracting Authority, a final decision on changing the building permit. • Stage III - Obtaining, on behalf of the Ordering Party, the final decision on the change of the building permit. • Stage IV - Execution of the executive design constituting the basis for the preparation of the bill of quantities and the investor's cost estimate, as well as the execution of construction and finishing works. • Stage V - Development of a complete multi-industry investor's cost estimate, allowing to determine the costs of implementing the entire investment consisting in adapting the rooms to the office function.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published9 Oct 2026

Type of service

71 · Architecture & engineering
CPV 71320000-7 · 71220000-6 · 71242000-6

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 11 months (7 awards, most recently March 2026) — the next award is due around March 2027 by that rhythm. The last award went to MGGP S.A.n = 7
  • 34% of this buyer's awards went to companies that had already won here before (787 awards since 2018, spread over 396 companies). 66% went to new names.n = 787 awards since 2018
  • The median procedure drew 3 bids (377 procedures with a bid count); 23% ended with a single bidder. Sector: median 4 bids.n = 377
  • The award came in at a median 87% of the estimated value (28 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 28
  • 5% of awards went to companies from abroad (787 awards with a known winner country). Sector average: 0%.n = 787

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
BCODERS Spółka Akcyjna352021–2026
RESTOR P.ANTON, A.CZAPSKI, T.ROSTROPOWICZ SPÓŁKA JAWNA172021–2025
COMP S.A.132021–2026
Paweł Owczarzak EUPOL102022–2024
Comp S.A.92024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2022
2
2023
6
2024
9
2025
6
2026
24 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 9 November at 11:00

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 6 completed awards — not a statement about this procedure.)

This procedure allows 31 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now