How to bid in this country: portals, deadlines, thresholds →
Design and delivery with installation and commissioning of a floating photovoltaic system with a capacity of up to 70 kWp on a retention tank located in the PCI area in Gdańsk
Zaprojektowanie oraz dostawa z montażem i uruchomieniem pływającej instalacji fotowoltaicznej o mocy do 70 kWp na zbiorniku retencyjnym znajdującym się na terenie PCI w Gdańsku — original title
Your path to submission
- Deadline: 2 November at 10:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the preparation of complete design documentation and delivery on its basis with the installation and commissioning of a floating photovoltaic installation with an installed capacity of not less than 65 kWp and not more than 70 kWp on the retention tank, which is located in the Pomeranian Investment Center, at ul. Capt. J. Dambka in Gdańsk. 2. The tank is located on plot no. ewid. 60 rpm 0253 in Gdansk. The exact location of the reservoir, the cable route and the KOGA Office Centre building are presented in the situational plan constituting Annex 1A to the ToR. 3. A detailed description of the subject-matter of the contract is set out in Annex 1 to the ToR.
Contract
Type of service
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| CRISTAL TRAVELNET Sp. z o.o. | 1 | 2022 |
| Andrzej Dzienisz Usługi Ogólno-Budowlane | 1 | 2026 |
| Sun&More | 1 | 2022 |
| GMSYNERGY SP. Z O.O. SP. J. | 1 | 2021 |
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 4,554 completed awards — not a statement about this procedure.)
This procedure allows 24 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Petroleum & fuels, 93 contracts went to foreign companies over the last 3 years (of 26,140 recorded awards) — mostly from Spain, Germany, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now