How to bid in this country: portals, deadlines, thresholds →
Thermomodernisation of residential buildings Wędrzyn 46A-B and 47A-B – replacement of joinery and insulation of the ceiling above the basement
Termomodernizacja budynków mieszkalnych Wędrzyn 46A-B i 47A-B – wymiana stolarki i docieplenie stropu nad piwnicą — original title
Your path to submission
- Deadline: 9 November at 10:00 — 8 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Thermomodernisation of residential buildings Wędrzyn 46A-B and 47A-B – replacement of joinery and insulation of the ceiling above the basement 1. The subject of the contract is the thermal modernisation of residential buildings Wędrzyn 46A-B and 47A-B – replacement of joinery and insulation of the ceiling above the basement. The description of the subject of the contract is included in the design documentation, Technical Specifications for the Execution and Acceptance of Construction Works, which are annexes to the tender specifications. A detailed description of the subject-matter of the contract is contained in Annexes 1a, 1b and 1c to the ToR.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (948 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to BERG24 Sp. z o.o.n = 948
- The median procedure drew 3 bids (781 procedures with a bid count); 30% ended with a single bidder. Sector: median 5 bids.n = 781
- 44% of this buyer's awards went to companies that had already won here before (2,562 awards since 2015, spread over 1,240 companies). 56% went to new names.n = 2,562 awards since 2015
- The award came in at a median 103% of the estimated value (44 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 44
- Across 7 procedures with structured selection criteria, this buyer most often required: Supply-chain management (3 of 7), Special authorisation or membership required (2 of 7), References: services (1 of 7), Staff qualifications (1 of 7).n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| WiMaKS Skwara Sławomir | 31 | 2018–2026 |
| Mikar Karol Miller | 30 | 2022–2026 |
| P.H.U. B&M DOROTA CEBULA ul. Mireckiego 3 96-100 Skierniewice | 24 | 2021–2026 |
| PRZEDSIEBIORSTWO HANDLOWO USŁUGOWE "WITEX" IRENEUSZ WITKOWSKI | 22 | 2021–2026 |
| Zakład Produkcji Pościeli "Świt" Izabela Wintoniak | 21 | 2021–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 5 completed awards — not a statement about this procedure.)
This procedure allows 32 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now