Przebudowa drogi powiatowej nr 1271T ul. Dolomitowej poprzez budowę chodnika w km od 7+590 do km 7+780 w msc. Zajączków
Poland · Kielce · how to bid here →
Your path to submission
- Deadline: 20 October at 10:00 — 16 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (127 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to F.H.U. „KOWEX” Piotr Cieśla.n = 127
- 53% of this buyer's awards went to companies that had already won here before (214 awards since 2021, spread over 102 companies). 47% went to new names.n = 214 awards since 2021
- Not one of the 214 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 214
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
The subject of the contract is the reconstruction of the district road No. 1271T Bolmin-Zjączków in Zajączków on the section from km: 7+590 to km: 7+780, in the municipality of Piekoszów. The scope of road reconstruction includes in particular: Road works on the district road no. 1271T, ul. Dolomitowa in Zajączków, from km 7+590 to km 7+780, with a length of 190,00 m. The scope includes the construction of a sidewalk with an area of 505,00 m2, the construction of a bus bay surface with an area of 140,00 m2 and descents you earth, drainage and finishing. Preparatory works. It is planned to carry out geodetic measurements and geodetic as-built inventory over a length of 0.19 km and to dismantle existing pavements from aggregates and paving stones, respectively 120.00 m2 and 95.00 m2. Earthworks. The scope includes removal of humus with an average thickness of 15 cm from an area of 505,00…
Show full description
… m2, excavation and engraving in the amount of 594,05 m3, with transport of excavated material up to 5 km and removal of excess for disposal, and making embankments in the amount of 181,00 m3. The embankments should be made of material obtained by the Contractor, with density and wetting of subsequent layers. The surface of the roadway and borders. Milling or demolition of the asphalt surface over an area of 1 178,00 m2 is planned, with an average depth of 10 cm, and cutting of the surface over a length of 300,00 m. Asphalt demolition material is subject to removal and becomes the property of the Contractor. The surface includes an AC16 leveling layer with a thickness of 4 cm on an area of 1178,00 m2 and an AC11 abrasive layer with a thickness of 4 cm on an area of 1159,00 m2, for the KR3 movement category. The frames include 15 × 30 cm concrete curbs on the C12/15 concrete bench and 8 × 30 cm concrete bench edges on the C12/15 concrete bench. Sewage should be made of gray Holland concrete cube with a thickness of 8 cm, on a cement-sand ballast with a thickness of 15 cm, with sand filling of welds. Walkway and descents. Once the substrate has been profiled and compacted, a layer of improved substrate is expected to be made of a 15 cm C1.5/2.0 cement-bonded base and a 15 cm C90/3 non-aggregate base with a 0-31.5 mm grain size and a 15 cm thickness. The surface is a colorful concrete cube of Behaton type with a thickness of 8 cm, laid on a cement-sand ballast, with joints filled with sand. the bus bay. The structure includes a contoured and compacted substrate, a layer of improved C3/4 cement-bonded substrate with a thickness of 25 cm, a non-aggregate C90/3 base with a grain size of 0-31,5 mm and a thickness of 35 cm, and a surface of 8 cm thick Behaton grey concrete cube on a cement-sand ballast, with sand-filled welds. The thicknesses of the layers are given after compaction, in accordance with the descriptions of costing items. Finishing works and drainage. The range includes the demulsion and profile of ditches, the strengthening of slopes with a palisade of 16.5 × 16.5 × 120 cm and openwork slabs 60 × 40 × 8 cm on 8 cm thick cement-sand ballast, the humbling of slopes and the height adjustment of water, gas and sewage fittings. Passes under the exits should be made of PVC-U or PP pipes with a diameter of 500 mm, class SN8, connected to rubber seals, on a bench of broken aggregate 15 cm thick, with prefabricated front walls with wings.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Robót Inżynieryjnych „Fart” Sp. z o.o. z siedzibą w Kielcach | 15 | 2022–2026 |
| ALBUD SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 9 | 2021–2025 |
| Przedsiębiorstwo Robót Inżynieryjnych „Fart” Sp. z o.o. , | 9 | 2024–2026 |
| Usługi transportowe - Roboty drogowe Marek Rycombel | 8 | 2021–2026 |
| ALBUD Sp. z o.o. | 7 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.