Supply and installation of street lighting in connection with the maintenance and modernization of existing lighting in the area of the city of Chorzów - Task No. 5
Dostawa i montaż oświetlenia ulicznego w związku z utrzymaniem i modernizacją istniejącego oświetlenia terenie miasta Chorzowa - Zadanie nr 5
Poland · Chorzów · how to bid here →
Your path to submission
- Deadline: 8 October at 09:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 12 months (4 awards, most recently October 2025) — by that rhythm the next award was due around September 2026. The last award went to BUDEX Piskorz Janusz.n = 4
- 41% of this buyer's awards went to companies that had already won here before (99 awards since 2021, spread over 59 companies). That is well above the sector norm (28%) — newcomers have a harder time here than elsewhere.n = 99 awards since 2021
- The median procedure drew 3 bids (13 procedures with a bid count); 23% ended with a single bidder. Sector: median 3 bids.n = 13
- Not one of the 99 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 99
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Electrical machinery, 88 contracts went to foreign companies over the last 3 years (of 8,207 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 3 (from 1,413 awards).
What the buyer is looking for
1. The subject of the contract is the delivery and installation of lighting for pedestrian crossings on the streets of the City of Chorzów along with the preparation of as-built documentation along with the contribution of a new installation to the geodetic resources of the City of Chorzów, in the following locations: 1) at the intersection of ul. Styczyński and ul. Chałupki, 2) at the intersection of ul. Styczyński and ul. Lompy, 3) at the intersection of ul. Soldiers of September and ul. Kingi, 4) at the intersection of ul. Łagiewnicka and ul. Krzyżowa, 5) at the intersection of ul. Krzyżowa and ul. Łagiewnicka, 6) at the intersection of ul. Main and ul. Kluczborska, 2. Together with the subject of the order, the Contractor undertakes to provide the Ordering Party with the instruction manual in Polish, warranty cards in Polish and other documents such as: approvals, certificates, etc.…
Show full description
… 3. A detailed description of the subject-matter of the contract and the manner of performance of the contract are set out in Annex 1 to this ToR and in the draft provisions of the contract constituting Annex 3 to the ToR. 4. The Municipal Board of Streets and Bridges informs that TAURON Nowe Technologie is responsible for maintaining the lighting infrastructure in the city of Chorzów. Therefore, the Contractor is obliged to contact TAURON branch in Chorzów at ul. Olszewski 1 in order to be allowed to perform works. 5. Requirements and conditions for performance of the contract: 1) During the implementation of the task, the Contractor will be obliged to ensure proper order, order, compliance with health and safety regulations, protection of facilities and networks located on the site and equipment for the development of the site and maintain them in proper technical condition, and after the completion of the site, 2) the Contractor will be obliged to protect underground and above-ground equipment as well as buildings and construction works located in the area and in the immediate vicinity of the implementation of the investment; 3) The Ordering Party requires that the waste resulting from the execution of the works is transported and stored at the waste disposal site at the contractor's expense. The Contractor will be obliged to provide the Ordering Party with relevant documents 4) Throughout the entire period of the contract, the Contractor is responsible for the construction site transferred, securing the place where the works are carried out, maintaining temporary markings, cleanliness on roadways and pavements both in the area of the works carried out as well as access roads. The Contractor shall be liable for security and for any damage to third parties resulting from the work carried out. 5) The Contractor is obliged to ensure access and access to the buildings throughout the entire period of work. 6) If the works will interfere with pedestrian, bicycle or car traffic, the Contractor is obliged to carry out a project of temporary change of traffic organization for the time of performing works in the public road lane related to the replacement of poles and lighting fixtures. 6. The contracting authority shall allow equivalent tenders to be submitted: 1) The Contracting Authority informs that whenever the origin (brand, trademark, manufacturer, supplier) of materials is indicated in this tender specification or annexes to the tender specification, or the standards, technical assessments, technical specifications or technical reference systems referred to in Article 101(1)-(3) of the Public Procurement Law Act are indicated, the Contracting Authority allows the offering of materials or solutions ‘equivalent’ in terms of technical, performance and operational parameters, provided that they guarantee the execution of works in accordance with the building permit issued and ensure that technical parameters not inferior to those assumed in this tender specification are obtained. 2) In the case of submitting an equivalent tender, the Contractor must prove to the Ordering Party that the offered supplies (products / materials) or solutions comply with the requirements of the Ordering Party described in this Terms of Reference and / or the Annexes to the Terms of Reference. To this end, the Contractor shall submit, together with the tender, the documents proving compliance referred to above. In addition: a)
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DROGBUD Nawierzchnie bitumiczne Sp. z o.o. | 6 | 2022–2025 |
| Lexbud Budownictwo i Infrastruktura Sp. z o.o. | 5 | 2022–2025 |
| ZRDiTZ "ROMUS" Sp. z o.o. | 5 | 2021–2023 |
| ZRD ORFIN SP. KOMANDYTOWA | 4 | 2022–2026 |
| Przedsiębiorstwo Techniki Sanitarnej ALBA Sp. z o.o. | 4 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.