Friedrich & ClementBETA

Development of the strategic noise map of the city of Bytom

Opracowanie strategicznej mapy hałasu miasta Bytomia

Poland · Bytom · how to bid here →

Your path to submission

  1. Deadline: 7 October at 09:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (29 awards, most recently April 2026) — by that rhythm the next award was due around September 2026. The last award went to DWOBUD Sławomir Dwojakowski.n = 29
  • The median procedure drew 2 bids (24 procedures with a bid count); 29% ended with a single bidder. Sector: median 4 bids.n = 24
  • 38% of this buyer's awards went to companies that had already won here before (357 awards since 2021, spread over 218 companies). 62% went to new names.n = 357 awards since 2021
  • 98% of the bids received came from small and medium-sized enterprises (12 procedures with a bid mix). Sector: 84%.n = 12
  • Across 6 procedures with structured selection criteria, this buyer most often required: Equipment, plant and technical facilities (6 of 6), References: services (6 of 6).n = 6

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.

Typical field: median 4 (from 4,644 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1. The subject of the contract is the development of a strategic noise map of the city of Bytom. 2. A detailed description of the subject-matter of the contract is set out in Annex 6 to the ToR – Description of the subject-matter of the contract and Annex 5 – Draft provisions of the contract. 3. The area covered by the strategic noise map will cover the area within the administrative boundaries of the city of Bytom. The total area of the site is 69.44 km2. The previous strategic noise map for the city of Bytom was drawn up in 2022 and is available at: https://i-biip.um.bytom.pl/add/file/1400887177.pdf. 5. Order names and codes according to the Common Procurement Vocabulary (CPV): Main code: 71354000-4 Mapping services Auxiliary codes: 90742300-3 Excess noise monitoring services 90742200-2 Noise protection services 6. The contracting authority does not allow for the possibility of…

Show full description

… submitting partial tenders. The contracting authority did not divide this contract into lots because the subject matter of the contract is uniform and its division would entail the need to coordinate the actions of different contractors, which could lead to difficulties in ensuring data consistency, compatibility of studies, timeliness of implementation and unambiguous determination of liability for possible errors or non-compliances. At the same time, the Contracting Authority points out that the value of the contract has been estimated at a level not exceeding the EU threshold. The contract is therefore fully accessible to small and medium-sized enterprises. 7. The Ordering Party does not reserve the obligation for the Contractor to perform the key part of the contract in person. The Contractor may subcontract part of the contract to a Subcontractor. Entrusting the performance of part of the contract to subcontractors does not release the contractor from responsibility for the proper performance of this contract. 8. Pursuant to Article 95 of the Public Procurement Act, the Contracting Authority does not require the Contractor or the Subcontractor to employ, on the basis of an employment relationship, persons who perform a specific type of activity in the performance of the contract.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Bytom
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published29 September 2026
CategoryArchitecture & engineering · CPV 71354000-4

Who has won here before

CompanyAwardsPeriod
INFOPOLGAZ Marlena Handel-Szczerba122021–2026
PRO OFFICE SPÓŁKA Z O.O.112021–2026
PPU FIGLER Henryk Figler82021–2025
Bytomskie Wodociągi Sp. z o.o.72023–2026
Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o72022–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202114
20223
20231
20247
20256
20266

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Wednesday 7 October at 09:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →