Friedrich & ClementBETA

Construction of a transit water supply network in Wałowice and replacement of the network in Dzikowo, Gubin municipality

„Budowa sieci tranzytowej wodociągowej w m. Wałowice oraz wymiana sieci w m. Dzikowo gm. Gubin”

Poland · Gubin · how to bid here →

Your path to submission

  1. Deadline: 5 October at 10:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (11 awards, most recently October 2024) — by that rhythm the next award was due around February 2025. The last award went to Jerzy Kozakowski.n = 11
  • 35% of this buyer's awards went to companies that had already won here before (49 awards since 2021, spread over 32 companies). 65% went to new names.n = 49 awards since 2021
  • Not one of the 49 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 49

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,935 recorded awards) — mostly from Germany, France, Switzerland.

Typical field: median 4 (from 4,644 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1. The planned investment includes: 1) the planned course of the water supply network within the Wałowice cadastral area through plots No: 76/1, 77/1, 54, 29, 30, 219/2, 198/1, 197, 196/10, 181/2, 165/2, 199/6, 86, 164,182, 222, 218/2, 76/3. 2) construction of a section of the new water supply transit network equipped with the necessary fittings and fittings with a minimum length of 4120 m from the Water Treatment Station in the Wałowice locality located on cadastral plot No 171/8 to the village of Dzikowo, providing residents of the village of Dzikowo with a constant supply of water intended for consumption and for firefighting purposes; 3) the current distribution water supply network in Dzikowo is largely exploited, which may not ensure sufficient quality and quantity of water supplied to the inhabitants of the village. As part of the investment, the distribution network will be…

Show full description

… replaced with a minimum length of 420m along with approx. 11 connections equipped with radio reading of water meters located in the water meter well located in front of each property, equipped with shut-off fittings and the necessary equipment for communities in front of each building, it is assumed that one main water meter with a larger diameter DN50 will be installed; 4) after the completed reconstruction of the network, the existing depleted Water Treatment Station in Dzików will be excluded (in a separate procedure not covered by the subject of the contract); 5) the estimated length of the distribution water supply network in Dzikowo will be at least 420m after modernization and reconstruction, and the transit transmission network from Wałowice to Dzikowo will be 4120m – the total length of newly built water supply networks on the basis of the network design documentation prepared by the Contractor will be 4540m; 6) it is assumed to build a water supply network in butt-welding technology or electro-resistance connection in excavation or trenchless technology from PEHD DN 160-300, PE100 SDR11 pipes between the villages of Wałowice and Dzikowo gm. Gubin together with a distribution network equipped with the necessary network fittings and equipment, including valves, hydrants. 2. Execution of the documentation includes: 1) preparation of design documentation (covering the entire material scope described below) containing technical design of the sanitary industry (executive by industry - if required) to the extent necessary to obtain a project by the Contractor on behalf of the Contracting Authority building permit; 2) the contractor of the complete design documentation and obtains all required mate-rials, i.e.: detailed maps of design objectives, studies, expert opinions, certificates resulting from the design documentation (works carried out) of regulations and standards and will draw up: the technical specifications for the execution and acceptance of the works; (b)predictions and detailed estimates; c) preparing an analysis of the potential of the project - a feasibility study in accordance with the guidelines provided - the study should be accompanied by a calculation annex in electronic form (spreadsheet). 3) complete design documentation will include, among others: a) technical project - 3 ext., b) preparation of works - 2 ext., c) investor's estimate - 2 ext., d) land development project - 3 ext., e) detailed technical specification of execution and acceptance of works - 1 ext., f) elaboration of the analysis of the potential of the project - feasibility study - according to Instructions for drawing up a Feasibility Study for investment projects applying for EFF support under FEWL 21-27, valid at the date of drawing up the study under priority 8 (for a project with a total eligible cost of less than PLN 50 million), issued by the ‘Managing Authority for the European Funds for Lubuskie Programme 2021-2027’ – 2 copies 3. The documentation contractor will conduct a detailed analysis of the topographical sculpture of the site and verify the altitude isolates of the area of the planned construction of the planned wo-supply network, in particular taking into account the need to maintain the required water pressure for, inter alia, fire protection purposes.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Gubin
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published25 September 2026
CategoryArchitecture & engineering · CPV 71322200-3

Who has won here before

CompanyAwardsPeriod
HOREX A. i E. Horoszkiewicz sp.j.52022–2025
ENEA Oświetlenie Sp. z o.o.42022–2026
Ziel-Bruk Makarewicz sp. z o.o.42022–2025
Zakład Handlu i Usług "ARKA" Arkadiusz Gusztyn32022–2026
PRZEDSIĘBIORSTWO PRODUKCYJNO-USŁUGOWO-HANDLOWE "UNO" Krzysztof Chwalisz22023
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20224
20237
20248
20261

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 5 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →