"Construction of household wastewater treatment plants in the Jabłonna municipality - 2026 edition"

„Budowa przydomowych oczyszczalni ścieków na terenie gminy Jabłonna – edycja 2026”

Poland · Jabłonna-Majątek · how to bid here →

Your path to submission

  1. Deadline: 12 October at 10:00 — 9 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (188 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Zesti Fos sp. z o.o.,.n = 188
  • The median procedure drew 3 bids (39 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 39
  • 53% of this buyer's awards went to companies that had already won here before (411 awards since 2018, spread over 173 companies). 47% went to new names.n = 411 awards since 2018
  • 2% of awards went to companies from abroad (411 awards with a known winner country). Sector average: 0%.n = 411
  • 90% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 84%.n = 7

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Subject of the contract: ‘Construction of backyard waste water treatment plants in the municipality of Jabłonna – 2026 edition’ is the construction of backyard waste water treatment plants in the municipality of Jabłonna. The subject of the contract consists of 2 tasks: 1) Task 1 – design and construction of 20 domestic waste water treatment plants for residents of the municipality of Jabłonna as part of the ‘Design and Build’ task and 2) Task 2 – construction of 1 waste water treatment plant at a public utility facility. The scope of task 1 includes the design and construction of 20 household wastewater treatment plants using rotary or sprinkled deposit technology, with a certificate for compliance with the PN-EN 12566-3 standard or equivalent, on private property in the Jabłonna commune in accordance with the list of plots included in the Functional and Utility Programme, hereinafter…

Show full description

… referred to as PFU, constituting Annex 1 to the SWZ. The contractor will obtain all the outputs, as well as the arrangements, opinions and administrative decisions necessary for the design, construction, commissioning and handover of the domestic waste water treatment plants for start-up and operation. Design documentation should be made in accordance with the applicable regulations and with the requirements presented in the PFU. The PFU contains situational maps indicating the location of the sewage treatment plant agreed with the property owners. If it is not possible to construct a sewage treatment plant due to the results of geological surveys or other obstacles, the Contractor will prepare an appropriate statement about the situation along with obtaining confirmation of providing information to the owner of the property, while the Contracting Authority will provide a substitute location. Negative verification of the property in terms of the possibility of installing a backyard sewage treatment plant at a given stage may not entail costs for the Ordering Party. The cost estimate(s) that the contractor is required to draw up and which will be annexed to the works contract must state the value of the works broken down by property included in the list. The scope of task 2 includes the construction of 1 sewage treatment plant at the Primary School in Tuszów on the basis of the project documentation held by the Contracting Authority, a valid building permit and a valid water law permit. The project documentation, together with the bill of quantities, is attached as Annex 1 to the FTZ. It should be noted that the scales attached to the FTZ are only in the alternative and cannot constitute the sole basis for the evaluation of the tender, which means that, when performing the contract, the Contractor may not rely on deficiencies (quantitative, generic) in the scales of the works and, on that basis, demand additional payment for the works necessary for the performance of which the scales of the works did not provide for. The Contractor’s tender should include all works necessary for the proper performance of the subject-matter of the contract to ensure its proper and effective functioning. In the event of discrepancies between the various elements of the project documentation, the Contractor is obliged to ask the Contracting Authority to clarify them before submitting a tender. The contracting authority expects all the works necessary for the proper performance of the contract to be carried out as remuneration for the performance of the contract, in particular if any of the tender documents provides for such works or their performance results from the adopted technology or is necessary for the proper performance of the contract for other reasons. The Contractor is obliged to provide a person who will perform the function of a CONSTRUCTION manager with building rights to manage construction works in the installation specialty in the field of networks, installations and equipment for heat, ventilation, gas, water supply and sewage, in accordance with the Construction Law Act of 7 July 1994 or equivalent rights issued on the basis of previously applicable regulations and a person designated to perform

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Jabłonna
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published25 September 2026
CategoryConstruction work · CPV 45000000-7

Who has won here before

CompanyAwardsPeriod
Gminne Przedsiębiorstwo Komunalne Eko Jabłonna Sp. z o.o.452021–2026
"FAL-BRUK” spółka z ograniczoną odpowiedzialnością spółka komandytowa162021–2026
ZESTI FOS Sp. z o.o.142022–2026
Dromacc sp. z o.o.122025–2026
P.P.H.U. „Anetka” Aneta Cieślińska102021–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20218
202240
202337
202448
202553
202638

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 12 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.