Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Construction of a selective municipal waste collection point in Górki Wielkie - "design and build" formula.

Budowa punktu selektywnej zbiórki odpadów komunalnych w Górkach Wielkich - formuła "zaprojektuj i wybuduj". — original title

PLPoland · BrennaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 10:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract is the design and execution of construction works, on the basis of the construction and technical design drawn up by the Contractor, based on the description of the subject of the contract contained in the FTZ and the Functional and Utility Programme, drawn up by CONCEPTPRO Michał Szafarczyk, os. Prince Władysław 6c/8, 44-240 Żory, for the investment entitled ‘Construction of a separate collection point for municipal waste in Górki Wielkie’. 2. The investment includes: 2.1. Designing the construction of a separate municipal waste collection point on plot No 64/3 located in Górki Wielkie in the area of Spółdzielcza Street, in accordance with the description and graphical part of the Functional and Utility Programme developed in December 2024 for the hardening of the entire area intended for PSZOK and the execution of construction works and equipment…

Show full description

… necessary for the functioning of PSZOK, including: - Biologically active surface management – low and high insulating greenery; - Execution of pavement paved throughout the area, divided into asphalt and concrete pavement; - Execution of a transhipment ramp for cars; - Making a car scale; - Creation of parking spaces for cars; - Construction of a garage for cars; - Delivery of a container with a social and office part and equipment for the needs of the concierge; - Delivery of the container and equipment for the exchange point of second-hand goods; - Construction of shed No. 1 with boxes open to waste; - Construction of shed No. 2 with boxes closed for waste and placement of containers and waste containers under it; - Installation of photovoltaic panels on the roof of shed No. 2; - Equipping containers with a RES-based heating and cooling system – heat pump, coil units; - Installation of PSZOK square lighting; - Fencing of the PSZOK area with entrance gates; - Execution of water supply and electricity connection as well as external installations: water supply, sanitary sewerage, rainwater sewerage, electricity, video, telecommunications and alarm monitoring; and execution of all necessary studies for the implementation of the investment necessary to obtain a building permit decision, e.g.: preparation of geotechnical documentation of the foundation of buildings, execution of design works (construction and technical design with a simplified cost estimate) and obtaining all necessary opinions, permits, arrangements and decisions, provided for by law, including decisions necessary for the execution of construction works. All costs in this respect shall be borne by the Contractor. Before submitting documents for the application for a building permit/notification of works not requiring a building permit, the Contractor shall submit the project documentation to the Contracting Authority for approval. Within 7 working days from the date of signing the contract, the Ordering Party shall provide the Contractor with: - a power of attorney for the Contractor to act on behalf of the Contracting Authority when dealing with all formal and legal matters related to the development of the project documentation constituting the above-mentioned subject of the contract, - a map for project purposes. 2.2 Execution of all construction works and other activities in accordance with the purpose of the investment, the description of the subject of the contract contained in the FTZ and the Functional and Utility Programme, as well as in the design documentation prepared by the Contractor, necessary for the full implementation and reception of the investment. Execution of the subject of the contract in accordance with applicable regulations, state and industry standards and technical conditions for the execution and acceptance of works.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published24 Sept 2026

Type of service

45 · Construction work71 · Architecture & engineering79 · Business services90 · Cleaning, environment & waste42 · Industrial machinery
CPV 45200000-9 · 45111200-0 · 45100000-8 · 71242000-6 · 71320000-7 · 71220000-6 · 71221000-3 · 79421200-3

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (24 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to GREŃ JÓZEF PRZEDSIĘBIORSTWO PRODUKCYJNO HANDLOWO USŁUGOWE "INSTAL GREŃ".n = 24
  • The median procedure drew 2 bids (9 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 9
  • 34% of this buyer's awards went to companies that had already won here before (78 awards since 2018, spread over 45 companies). 66% went to new names.n = 78 awards since 2018
  • Not one of the 78 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 78

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Dro-most Marek Kunz62021–2026
Firma Handlowa "ENDI"Edyta Chrapek52021–2025
Firma Handlowo Usługowa Dariusz Wrona32024–2025
Poczta Polska S.A.32022–2025
InterRisk TU SA Vienna Insurance Group32024–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2021
3
2022
7
2023
5
2024
7
2025
8
2026
31 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 39 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now