Friedrich & ClementBETA

"Extension and reconstruction of the Cultural Center building of Jabłonna Municipality in Piotrków Drugi" as part of the project "Development of culture and protection of cultural heritage in Otulina Roztocza – Stage I"

„Nadbudowa i przebudowa budynku Centrum Kultury Gminy Jabłonna w m. Piotrków Drugi” w ramach projektu „Rozwój kultury i ochrona dziedzictwa kulturowego w Otulinie Roztocza – Etap I”

Poland · Jabłonna-Majątek · how to bid here →

Your path to submission

  1. Deadline: 9 October at 10:00 — 6 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (188 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Zesti Fos sp. z o.o.,.n = 188
  • The median procedure drew 3 bids (39 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 39
  • 53% of this buyer's awards went to companies that had already won here before (411 awards since 2018, spread over 173 companies). 47% went to new names.n = 411 awards since 2018
  • 2% of awards went to companies from abroad (411 awards with a known winner country). Sector average: 0%.n = 411
  • 90% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 84%.n = 7

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is ‘Superstructure and reconstruction of the building of the Cultural Centre of the Jabłonna Commune in Piotrków Drugi’. Location: Piotrków Drugi 10, 23-114 Piotrków Second plot No 682/2, area 0010 Piotrków Drugi, commune Jabłonna 1. The subject of the contract is the execution of construction works consisting in the superstructure and reconstruction of the building of the Culture Centre of the Jabłonna Commune together with the reconstruction of external stairs and the construction of ramps for the disabled, together with the execution of all works, supplies, installations, devices, trials, tests, regulations, commissioning and as-built documentation necessary for the proper use of the facility. 2. The scope includes works of all industries resulting from design documentation, in particular construction, architectural, sanitary, electrical, teletechnical,…

Show full description

… fire protection, HVAC, photovoltaic installation and works related to stage technology. 3. The part of the building used by the TSO shall remain outside the essential scope of the contract, with the exception of interlinked works and installations as indicated in the design documentation. 4. The contract must be carried out in accordance with the project documentation constituting Annex 1 to the FTZ, in particular: • Land development design, • Architectural and construction design, • Technical design with industry studies, including construction, sanitary, electrical and telecommunication, • opinions, arrangements, decisions and requirements resulting from documentation. 5. In the event of discrepancies between the documents, the Contractor is obliged to notify them to the Contracting Authority before performing the works covered by the discrepancy. Without a written decision of the Ordering Party, the Contractor should not independently adopt a solution affecting the scope, cost or technical parameters. 6. Detailed technical solutions should be adopted in accordance with the technical documentation and relevant industry studies. 7. The building is a public facility, category IX, with two above-ground floors and no basement. 8. Basic parameters: cubic capacity 4 920,20 m³; built-up area 679,00 m²; a total area of 1 018.90 m²; a usable area of 669.85 m²; height 11.85 m; length 21.38 m; width 36.90 m. 9. The facility includes i.a. Cultural Centre, library, hall/auditorium, exhibition and workshop rooms, administrative, social, sanitary and technical rooms. 10. Preparatory and organizational work • taking over and securing the construction site and designating hazardous zones; • organisation of construction facilities, transport routes and storage sites in such a way as not to interfere with the functioning of the Voluntary Fire Brigade unit in Piotrków • securing the existing facility and non-demolition elements; • making the necessary measurements, working and surveying inventories; • coordination of works with the user of the facility and the Ordering Party to the extent required for the safe conduct of works. 11. Demolition works, construction works, superstructure and roof, facades and thermal insulation, joinery and metalwork, finishing works, mobile and acoustic walls, lift, external stairs and slipway, land use, sanitary installations, water connection, gas boiler repair, electrical installations, ICT installation, photovoltaic installation, fire protection, availability, ventilation and air conditioning, C.O. and technological heat, sewerage and water installations, stage technology should be performed in accordance with the technical documentation. 12. Materials and equipment requirements • Materials and equipment must be brand new, complete and approved for use in accordance with applicable legislation; • For components requiring fire resistance classes, supporting documents for the required classification and system solution shall be provided; • equipment to be collected by the competent authorities must be reported and prepared for collection; • The contractor is responsible for the compatibility of the supplied elements

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Jabłonna
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published24 September 2026
CategoryConstruction work · CPV 45210000-2

Who has won here before

CompanyAwardsPeriod
Gminne Przedsiębiorstwo Komunalne Eko Jabłonna Sp. z o.o.452021–2026
"FAL-BRUK” spółka z ograniczoną odpowiedzialnością spółka komandytowa162021–2026
ZESTI FOS Sp. z o.o.142022–2026
Dromacc sp. z o.o.122025–2026
P.P.H.U. „Anetka” Aneta Cieślińska102021–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20218
202240
202337
202448
202553
202638

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 9 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →