Development of design and cost estimate documentation for the task: "Reconstruction of the 70th Anniversary of Regaining Independence Municipal Stadium at Sportowa Street"
Opracowanie dokumentacji projektowo-kosztorysowej dla zadania: „Przebudowa stadionu miejskiego 70-lecia Odzyskania Niepodległości przy ul. Sportowej”
Poland · Dębica · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (48 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Arkadis sp.zoo S2 sp.k..n = 48
- 50% of this buyer's awards went to companies that had already won here before (312 awards since 2015, spread over 122 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 312 awards since 2015
- The median procedure drew just one bid (54 procedures with a bid count); 63% ended with a single bidder. Sector: median 4 bids.n = 54
- 100% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 84%.n = 6
- 2% of awards went to companies from abroad (312 awards with a known winner country). Sector average: 0%.n = 312
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,995 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
The subject of the contract is the preparation of project and cost documentation together with obtaining administrative decisions and performing author's supervision for the task "Reconstruction of the municipal stadium of the 70th anniversary of Regaining Independence at ul. Sports.’ The study should include a project of reconstruction of the existing 70th anniversary Stadium in Dębica, on plot no. 166/86 rpm 1 in Dębica in order to adapt the facility to the licensing requirements for the 2nd league club competitions. The scope of the study will include: a) Land development project – 5 copies (including 2 copies in the form of printed scans of the project sealed by the architectural and construction administration). b) Execution of the architectural and construction project – 5 copies (including 2 copies in the form of printed scans of the project sealed by the architectural and…
Show full description
… construction administration). c) Execution of the multi-branch technical project – 5 copies. d) Execution of multi-branch implementing projects – 5 copies. e) Execution of work dimensions – 2 copies with reference to SSTWiORB and CPV numbers. f) Execution of investor's estimates of all sectors – 2 copies. In the case of splitting the investment into stages, project documentation, work measurements and investor's estimates should allow for independent implementation of each stage together with determination of the cost value of individual stages. g) Execution of Technical Specifications for the Implementation and Receipt of Works (STWiORB) – 2 ex. h) Equipment specifications – 2 ex. i) Visualisation of 4 ex. external and 4 internal ex. j) Obtaining a building permit decision together with prior obtaining all required arrangements, opinions, technical conditions, derogations, permits, provisions and decisions for the task Reconstruction of the 70th anniversary of Independence Stadium at ul. Sportowa . k) Performing author's supervision over the project during construction works and during the warranty period for defects for the completed works. l) Performing other formal and legal activities not listed above, including: obtaining a map for design purposes, carrying out other studies, expert opinions, carrying out geotechnical surveys, obtaining technical conditions for connections, obtaining all the required arrangements and opinions, carrying out any expert opinions, obtaining an environmental decision (if required), obtaining a decision on the location of a public purpose investment or a decision on building conditions, as well as carrying out all the required studies, arrangements, opinions, expert opinions and formal and legal activities related to the design and implementation of the Emergency Refuge Site (MDS) within the designed main building of the stadium. The full description of the subject-matter of the contract can be found in Annex 6 – Description of the subject-matter of the contract.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zakład Usług Miejskich Sp. z o. o. | 55 | 2021–2026 |
| EUROVIA Polska S.A. Bielany Wrocławskie, ul. Irysowa 1, 55-040 Kobierzyce | 28 | 2021–2026 |
| Przedsiębiorstwo Budowlano-Usługowe HAND-BUD Sp. z o.o. | 9 | 2022–2026 |
| Firma Handlowo-Usługowa „TRANSKOP“ Spółka Cywilna Mateusz Smoła | 8 | 2022–2026 |
| WOD-PAR INSTALACJE PRZEMYSŁOWE BOGUSŁAW LESIAK | 7 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.