Modernization of ground floor premises of the building together with change of use, adaptation for the needs of people with special needs and adaptation for the needs of the Social Services Center
Modernizacja pomieszczeń parteru budynku wraz ze zmianą sposobu użytkowania, dostosowaniem dla potrzeb osób ze szczególnymi potrzebami oraz dostosowaniem na potrzeby Centrum Usług Społecznych
Poland · Tomaszów Lubelski · how to bid here →
Your path to submission
- Deadline: 6 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
4.1. The subject of the contract are construction works consisting in the modernization of the premises of the ground floor of the building along with a change in the way of use, adaptation for the needs of people with special needs and adaptation for the needs of the Social Services Centre in Tomaszów Lubelski. 4.2. Place of implementation: parcel number 63, parcel identifier 061801_1.0001.AR_32.63, Tomaszów Lubelski. After the completion of the task, the building will serve as a public administration building, category XII, intended, among others, for the Social Services Centre. 4.3. The material scope includes in particular: a. demolition of the existing vestibule / porch and execution of accompanying works; b. moving the main entrance, making new terrain stairs, resting place and roofing; c. installation of a ready-made metal ramp for people with special needs, with platforms, stops…
Show full description
… and double-sided handrails; d. reconstruction of the functional layout of the ground floor, including demolition and construction of partition walls, separation of the vestibule, hall, service room, office rooms and sanitary facilities; e. adaptation of the ground floor to the needs of people with special needs, in particular the construction of an accessible toilet, removal of thresholds, widening of passages and installation of automatic entrance doors; f. replacement of internal and external door joinery on the ground floor; g. execution of new finishing layers of floors, wall cladding, ceilings and painting works; h. reconstruction of electrical installation, lighting and plug sockets, execution of fire-fighting current switch and emergency and evacuation lighting; i. reconstruction of the water supply and sewage system on the ground floor and works in the central heating system; j. fire protection works, including required separations, markings, appliances and equipment, in accordance with industry documentation; k. land development works, including local hardening, a band next to the building, greenery arrangement and restoration of the site; l. segregation, export and management of waste generated during works; m. making tests, measurements, commissioning, as-built documentation and handing over acceptance documents. 4.4. The detailed scope, parameters and performance standard shall together determine: design documentation, land development project, architectural and construction project, industry technical projects, STWiORB, pre-measures of works, FTZ, explanations and changes of FTZ and draft agreements. 4.5. The Contractor shall also carry out all ancillary and ancillary works necessary for the complete, safe and fit-for-purpose commissioning of the subject-matter of the contract, even if they are not specified separately, but are the result of documentation or technical knowledge. 4.6. As part of the construction works carried out in connection with the performance of works in an active building, it is necessary to develop and secure the area of works consisting of: - separating the area on which the work will be carried out in a way that prevents access by outsiders; during the execution of the works, the Contractor shall provide and install the necessary guards and fencing to cover the work area as much as possible and temporary protections such as: dams, warning signs, barriers, etc., The cost of securing the site of works is not subject to separate payment and is assumed to be included in the contract price (indirect costs). - organising the facilities for the works, including the storage part, - accepting full responsibility by the Contractor for the materials, tools and equipment located on the site of the works, and for the safety of persons located on the site of the works; - clean-up works after completion of works. - preparing in one copy and handing over at the end of the works to the Ordering Party attestations, approvals, certificates and declarations of conformity for the built-in materials; - re-assembly of dismantled items of equipment for the duration of the renovation works; execution of final works
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PHU "Awangarda" Ewelina Winiarska | 2 | 2025 |
| Zakład Doskonalenia Zawodowego | 1 | 2023 |
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.