Construction, expansion and reconstruction of cultural infrastructure facilities in łańcut municipality under the project strengthening the potential of cultural heritage in the rof area
Budowa, rozbudowa i przebudowa obiektów infrastruktury kultury w gminie łańcut w ramach projektu wzmacnianie potencjału dziedzictwa kulturowego naterenie rof — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. PART 1 OF THE ORDER: CONSTRUCTION, DEVELOPMENT AND RECONSTRUCTION OF CULTURE INFRASTRUCTURE FACILITIES IN THE CHAIN COMMUNITY WITHIN THE PROJECT STRENGTHENING THE POTENTIAL OF CULTURAL HERITAGE ON THE ROF - HEADS AREA The task includes a comprehensive extension and reconstruction of the building of the Cultural Centre in Głuchów, including: 1) Demolition, preparatory works, including the demolition of elements that interfere with the investment. 2) Ground and foundation works. 3) Structural, concrete, masonry works. 4) Works in the field of roofs and roof coverings, machining. 5) Works in the field of foundations, floors and floors. 6) Window and door joinery and joinery works. 7) Plastering work, cladding and suspended ceilings. 8) Finishing works; 9) Facade works; 10) Works in the field of electrical, sanitary, teletechnical, cctv, alarm, guidance loops, sound system and stage…
Show full description
… lighting. 11) Ensuring accessibility for persons with disabilities; 12) Supply and installation of equipment; 13) Land development and removal of collisions with existing infrastructure, greenery. The task includes the execution of a set of works described in the design documentation, measurements, specifications and guidelines of the contracting authority provided at the stage of awarding the contract. The facility should be complete, fully functional and accessible to people with disabilities. The detailed scope of the contract is specified in the Construction Project, Executive Project, Work Measurements, SST and Delivery Specifications attached to the FTZ. The technical documentation for Part 1 of the order constitutes Annex I. No. 11 to SWZ. The detailed description of the order includes SWZ. 2. PART 2 OF THE ORDER: CONSTRUCTION, DEVELOPMENT AND RECONSTRUCTION OF CULTURE INFRASTRUCTURE FACILITIES IN THE CHAIN COMMUNITY WITHIN THE PROJECT STRENGTHENING THE POTENTIAL OF CULTURAL HERITAGE AT ROF - ALBIGOWA The task includes a comprehensive extension and reconstruction of the building of the Cultural Centre in Albigowa, including: 1) Demolition and preparatory works, including the demolition of objects interfering with the investment. 2) Ground and foundation works. 3) Structural, concrete, masonry works. 4) Works in the field of roofs and roof coverings, machining. 5) Works in the field of foundations, floors and floors. 6) Window and door joinery and joinery works. 7) Plastering work, cladding and suspended ceilings. 8) Finishing works; 9) Facade works; 10) Works in the field of electrical, sanitary, teletechnical, cctv, alarm, guidance loops, sound system and stage lighting. 11) Ensuring accessibility for persons with disabilities; 12) Supply and installation of equipment; 13) Land development and removal of collisions with existing infrastructure, greenery. The task includes the execution of a set of works described in the design documentation, measurements, specifications and guidelines of the contracting authority provided at the stage of awarding the contract. The facility should be complete, fully functional and accessible to people with disabilities. The detailed scope of the contract is specified in the Construction Project, Executive Project, Work Measurements, SST and Delivery Specifications attached to the FTZ. The technical documentation for Part 2 of the order constitutes Annex II. No. 12 to SWZ. The detailed description of the order includes SWZ. 3. PART 3 OF THE ORDER: CONSTRUCTION, DEVELOPMENT AND RECONSTRUCTION OF CULTURE INFRASTRUCTURE FACILITIES IN THE CHAIN COMMUNITY WITHIN THE PROJECT STRENGTHENING THE POTENTIAL OF CULTURAL HERITAGE IN THE ROF - KRACZKOWA AREA The task includes a comprehensive reconstruction and change in the way of using parts of the building of the Cultural Centre in Kraczkowa, including: 1) Demolition, preparation works, 2) Construction, concrete, masonry works. 3) Works in the field of roofs and roof coverings, machining. 4) Works in the field of foundations, floors and floors. 5) Window and door joinery and joinery works. 6) Plastering works, cladding and suspended ceilings. 7) Finishing works; 8) Facade works; 9) Electrical, sanitary, teletechnical, cctv, alarm, indication loop works
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (74 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to Kielar-BUD Łukasz Kielar.n = 74
- The median procedure drew 2 bids (15 procedures with a bid count); 47% ended with a single bidder. Sector: median 5 bids.n = 15
- 45% of this buyer's awards went to companies that had already won here before (191 awards since 2015, spread over 96 companies). 55% went to new names.n = 191 awards since 2015
- 1% of awards went to companies from abroad (191 awards with a known winner country). Sector average: 0%.n = 191
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Zakład Gospodarki Komunalnej Gminy Łańcut sp. z o.o. | 19 | 2022–2026 |
| Firma Usługowa „Grześki” Sp. z o. o. | 9 | 2021–2026 |
| Przedsiębiorstwo Usługowo-Budowlane ROL-BUD Tomasz Nicpoń | 7 | 2023–2026 |
| P.P.U.H. "JUREX" Jerzy Krzok | 6 | 2021–2026 |
| Usługi Transportowe Witold Socha | 6 | 2021–2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 84 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now