Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Work to replace the water intake in the Petrosu

Travaux de remplacement de la prise d'eau dans le Petrosu — original title

FRFrance · PORTO-VECCHIO CedexBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 3 December at 12:00 — 32 days left.
  2. The submission point is stated in the notice (link on this page). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of this contract is: work to replace the water intake in the Petrosu

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published28 Oct 2026
ProcedureOUVERT
Place of performancePORTO VECCHIO

Type of service

45 · Construction work
CPV 45232150

Clement What the numbers say about this buyer

  • The median procedure drew 2 bids (13 procedures with a bid count); 46% ended with a single bidder. Sector: median 6 bids.n = 13
  • 4% of this buyer's awards went to companies that had already won here before (47 awards since 2016, spread over 31 companies). That is well below the sector norm (26%) — this buyer switches suppliers more often than others.n = 47 awards since 2016
  • 15% of awards went to companies from abroad (47 awards with a known winner country). Sector average: 4%.n = 47

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
SARL EPB22018–2022
SAS VALLI22022–2023
APAVE SUDEUROPE SAS12020
E.U.R.L CORSE NETTOYAGE TRAITEMENT12017
ORANGE Agence Entreprises Rhône Méditerranée12016
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2025
3
2026
4 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 3 December at 12:00

Tactics

When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 42,545 completed awards — not a statement about this procedure.)

This procedure allows 37 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on BOAMP / profil d'acheteur. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BOAMP / profil d'acheteur before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now