How to bid in this country: portals, deadlines, thresholds →
Contract for the construction of a retaining wall
Marché de travaux de construction d'un mur de soutènement — original title
Your path to submission
- Deadline: 16 November at 12:00 — 15 days left.
- The submission point is stated in the notice (link on this page). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Contract for the construction of a reinforced concrete retaining wall.
Contract
Type of service
Clement What the numbers say about this buyer
- 47% of this buyer's awards went to companies that had already won here before (20 awards since 2023, spread over 10 companies). That is well above the sector norm (26%) — newcomers have a harder time here than elsewhere.n = 20 awards since 2023
- The median procedure drew 8 bids (13 procedures with a bid count); 0% ended with a single bidder. Sector: median 6 bids.n = 13
- Not one of the 20 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 20
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| TRANSPORTS SALIME | 2 | 2025 |
| AUI ARCHITECTURE | 2 | 2025 |
| SARL MAHONET | 2 | 2025 |
| RLB/SQA | 2 | 2025 |
| GROUPE ELAN | 2 | 2025 |
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 42,545 completed awards — not a statement about this procedure.)
This procedure allows 22 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now