Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

SAUTRON - Requalification of the Chemin des Plis

SAUTRON - Requalification du Chemin des Plis — original title

FRFrance · NantesBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 13 November at 12:00 — 12 days left.
  2. The submission point is stated in the notice (link on this page). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (FR).

Show original description (FR)

SAUTRON - Requalification Chemin des Plis

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published14 Oct 2026
ProcedureOUVERT
Place of performance(44) Loire-Atlantique

Type of service

45 · Construction work
CPV 45233140 · 45316110 · 45233221 · 45112700

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (70 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to SAS TERRIEN MENUISEIRE.n = 70
  • The median procedure drew 4 bids (1,016 procedures with a bid count); 17% ended with a single bidder. Sector: median 6 bids.n = 1,016
  • 24% of this buyer's awards went to companies that had already won here before (2,298 awards since 2015, spread over 1,133 companies). 76% went to new names.n = 2,298 awards since 2015
  • 5% of awards went to companies from abroad (2,298 awards with a known winner country). Sector average: 4%.n = 2,298

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
COLAS CENTRE OUEST322015–2020
CHARIER TP SUD122016–2026
ID VERDE112016–2021
EUROVIA ATLANTIQUE112016–2019
EIFFAGE ROUTE SUD OUEST112018–2020
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

12
2024
20
2025
29
2026
61 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 13 November at 12:00

Tactics

When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 59 completed awards — not a statement about this procedure.)

This procedure allows 31 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). A normal window for this market.

Foreign bidders

In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on BOAMP / profil d'acheteur. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BOAMP / profil d'acheteur before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now