How to bid in this country: portals, deadlines, thresholds →
Renewal of public lighting clock supervision and connectivity subscriptions and adaptation of existing fleet footbridges
Renouvellement des abonnements de supervision et de connectivité des horloges d'éclairage public et adaptation des passerelles du parc existant — original title
Your path to submission
- Deadline: 5 November at 12:00 — 4 days left.
- The submission point is stated in the notice (link on this page). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Supervision and connectivity of public lighting clocks - Renewal of subscriptions and adaptation of gateways - Existing park BH Technologies Radiolite XP 410 and XP 430 The framework agreement will be executed by issuing purchase orders. The services are paid for by unit prices. The value indicated in this notice corresponds to the maximum amount of orders that may be issued during the term of the framework agreement
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 6 bids (138 procedures with a bid count); 4% ended with a single bidder. Sector: median 3 bids.n = 138
- 18% of this buyer's awards went to companies that had already won here before (217 awards since 2020, spread over 118 companies). 82% went to new names.n = 217 awards since 2020
- 17% of awards went to companies from abroad (217 awards with a known winner country). Sector average: 14%.n = 217
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ARTELIA | 4 | 2023–2025 |
| SOCOTEC CONSTRUCTION | 3 | 2023–2025 |
| NIOBE STRATEGIE | 3 | 2023–2025 |
| Bureau Veritas Construction · Berlin | 3 | 2023–2025 |
| QUENEA ENERGIES RENOUVELABLES | 3 | 2020–2025 |
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 687 completed awards — not a statement about this procedure.)
This procedure allows 29 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In France · Post & telecom services, 49 contracts went to foreign companies over the last 3 years (of 767 recorded awards) — mostly from Germany, Switzerland, Netherlands.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now