Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Construction of a school complex for the municipality of Fontaine: wood cladding, external wood joinery and metalwork lots

Construction d'un groupe scolaire pour la commune de Fontaine: lots bardage bois, menuiseries extérieures bois et serrurerie — original title

FRFrance · FontaineBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 10:00 — 1 day left.
  2. The submission point is stated in the notice (link on this page). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Construction of a school group for the commune of Fontaine: wood cladding lots, wood exterior joinery and locksmithing

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€940,000
Published29 Sept 2026
ProcedureOUVERT
Place of performanceFRK24 - Isère

Type of service

45 · Construction work44 · Construction materials
CPV 45214200 · 45262650 · 45420000 · 44316500

Clement What the numbers say about this buyer

  • The median procedure drew 13 bids (49 procedures with a bid count); 2% ended with a single bidder. Sector: median 6 bids.n = 49
  • 5% of this buyer's awards went to companies that had already won here before (102 awards since 2015, spread over 67 companies). That is well below the sector norm (26%) — this buyer switches suppliers more often than others.n = 102 awards since 2015
  • 2% of awards went to companies from abroad (102 awards with a known winner country). Sector average: 4%.n = 102

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
COMPLETEL22015–2019
LELY ENVIRONNEMENT22026
Orange · Augsburg22019–2023
LACOSTE22018–2023
DECITRE22018–2023
From the recorded awards · regular winners know this buyer's requirements — that is your competition.
·
Deadline — Monday 2 November at 10:00

Tactics

When this buyer has awarded in this sector, usually 13 or more bids came in. Many compete here — price and references decide. (Based on 17 completed awards — not a statement about this procedure.)

This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on BOAMP / profil d'acheteur. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BOAMP / profil d'acheteur before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now