How to bid in this country: portals, deadlines, thresholds →
Demolition contract (main contract), C-, D- and H-house, Tikkamäki, North Karelia wellbeing services county
Purku-urakka (pääurakka), C-, D- ja H-talo, Tikkamäki, Pohjois-Karjalan hyvinvointialue — original title
Your path to submission
- Deadline: 1 December at 12:00 — 30 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Demolition contract (main contract), C-, D- and H-house, Tikkamäki, North Karelia well-being area The subject of the construction project is the renovation and demolition of building services for the C-, D- and H-wings of North Karelia Central Hospital. In addition, building services technical changes are made in Part A. The buildings to be demolished will be replaced by a new N-building in phase 2, which will be connected to the rest of the hospital's property mass. The property is located at Tikkamäentie 16, 80210 Joensuu. In addition to the demolition of the buildings, the project includes the renovation of the existing building services lines so that the demolition of the C, D and H buildings can be carried out. The contract also includes the demolition of all the above-mentioned buildings and building services so that the buildings can be demolished as planned. The construction…
Show full description
… project is carried out on the basis of construction and special plans commissioned by the developer in the form of a fixed-price shared contract, in which the contractor for the demolition of civil engineering works acts as the main contractor and the main contractor referred to in the legislation. Plumbing, ventilation, electrical and building automation work shall be carried out as subcontracts to the main contractor to the extent indicated in this work programme and the attached works documents. Surface and volume of buildings: - Building C, demolition area 4500 brm2, volume approx. 17000 m3 - Building D, demolition area 50 brm2, volume 200 m3 - Building H, demolition area 113 brm2, volume 430 m3 More detailed description of the work programme.,
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew just one bid (158 procedures with a bid count); 58% ended with a single bidder. Sector: median 4 bids.n = 158
- 62% of this buyer's awards went to companies that had already won here before (449 awards since 2023, spread over 169 companies). That is well above the sector norm (48%) — newcomers have a harder time here than elsewhere.n = 449 awards since 2023
- Not one of the 449 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 449
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Pienkoti Aura Oy | 27 | 2025–2026 |
| Toivo ammatillinen perhekoti Oy | 20 | 2023–2024 |
| Rytmikodit Oy Forte-yksikkö | 19 | 2024–2025 |
| Attendo Vehniän Koivukodit Oy | 15 | 2025–2026 |
| Saalinki Oy | 12 | 2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 3,605 completed awards — not a statement about this procedure.)
This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 1,452 procedures). A normal window for this market.
Foreign bidders
In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,926 recorded awards).
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now