How to bid in this country: portals, deadlines, thresholds →
Espoon Asunnot Oy / Vermonpolku 3 Purku contract
Espoon Asunnot Oy / Vermonpolku 3 Purku-urakka — original title
Your path to submission
- Deadline: 4 November at 14:00 — 3 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Espoon Asunnot Oy / Vermonpolku 3 The demolition project is a demolition site for terraced houses and courtyard buildings located in the 51st district of the city of Espoo, Leppävaara, block 51116 on plot 9 (former plot no. 6), address Vermonpolku 3, 00370 Espoo.,
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (58 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to Argentum Oy.n = 58
- 23% of this buyer's awards went to companies that had already won here before (274 awards since 2017, spread over 180 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 274 awards since 2017
- The median procedure drew 8 bids (216 procedures with a bid count); 3% ended with a single bidder. Sector: median 4 bids.n = 216
- The award came in at a median 84% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 24
- Across 7 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (4 of 7), Minimum turnover in the contract field (3 of 7), Minimum annual turnover (1 of 7).n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| TNRak Oy | 6 | 2021–2022 |
| Rakennusliike SoiMu oy | 5 | 2024–2026 |
| Lujatalo Oy · KUOPIO | 5 | 2018–2020 |
| A-Insinöörit Suunnittelu Oy | 5 | 2021–2024 |
| Jalon Uusimaa Oy | 4 | 2024–2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 32 completed awards — not a statement about this procedure.)
This procedure allows 22 days between publication and deadline — typical in this country is 32 (median of 1,471 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,931 recorded awards).
How to bid