How to bid in this country: portals, deadlines, thresholds →
Carpentry according to DIN 18 355 - Interior doors - 2040/2026
Tischlerarbeiten nach DIN 18 355 - Innentüren - 2040/2026 — original title
Your path to submission
- Deadline: 24 November at 10:30 — 23 days left.
- You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Carpentry according to DIN 18 355 - Interior doors New construction of a nursery with a total of 8 groups as well as kitchens, staff and multi-purpose rooms. Area GFA (R+S): approx. 1988 m2 floors: Partial basement, ground floor, upper floor, DG as stepped floor Building height: + 10.80 m The wall structures for interior door installation differ in reinforced concrete, aerated concrete masonry and drywall. In addition to surround, block and corner frames, sliding door frames are also used. All openings are made without sills and due to the use as a daycare, the doors are equipped with finger clamp protection. In addition to carpentry work, hardware and metal construction work is also due, which includes topics such as locking systems, door closers or metal doors. Quantity or scope of the contract - A total of 87 interior doors over 4 floors including building physical requirements such…
Show full description
… as sound and fire protection, locking systems, top door closers, clamping protection, etc. Execution deadlines - Beginning and end of the contract execution for the production of the screed within 12 working days of receipt of the request by the contracting authority (Section 5(2), second sentence, VOB/B); The call is expected to be sent to you by May 2027. The performance is to be completed within 137 working days after the above deadline for the start of execution. Conditions of Participation Proof of Suitability: - None - The contracting authority points out that, in order to ensure a speedy procedure, only requests received by the contracting authority in good time can be answered. Deadline: 16.11.2026 ATTENTION The procurement documents can be accessed free of charge, unrestrictedly, completely and directly at www.evergabe-online.de. There is no obligation to register on the allocation platform. However, you will only be informed automatically about changes to the procurement documents, resubmissions, bidding questions, reply letters, etc. if you have registered in advance. Otherwise, you are obliged to independently obtain the necessary information. ‘Information on data collection pursuant to Article 13 of the General Data Protection Regulation (GDPR) can be found in the procurement documents in the attached information sheet’.
Contract
Clement What the numbers say about this buyer
- 8% of this buyer's awards went to companies that had already won here before (14 awards since 2017, spread over 13 companies). That is well below the national norm (45%) — this buyer switches suppliers more often than others.n = 14 awards since 2017
- The median procedure drew 3 bids (13 procedures with a bid count); 23% ended with a single bidder. Country: median 3.1 bids.n = 13
- Across 5 procedures with structured selection criteria, this buyer most often required: References: supplies (5 of 5), Minimum annual turnover (5 of 5), Professional register enrolment (5 of 5).n = 5
- Not one of the 14 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Lindner AG · Arnstorf | 8 | 2006–2010 |
| Wärme + Wasser GmbH · Schlieben | 7 | 2009–2010 |
| Schandert GmbH | 6 | 2007–2010 |
| Becker + Armbrust GmbH | 6 | 2008–2010 |
| SAG GmbH FB Energieanlagentechnik NL Berlin · Berlin | 6 | 2010 |
Contracting authority contact
Tactics
This procedure allows 25 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now