Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

IM - Business English - Karlsruhe

IM - Wirtschaftsenglisch - Karlsruhe — original title

DEGermany · KölnBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 5 November at 13:00 — 5 days left.
  2. You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Acquisition of the basics of English economic language, regional economics and economics Framework contract for 3 years with the extension option of up to 2 years pursuant to § 15(4) UVgO, or § 21(6) VgV in conjunction with § 65(2) VgV. 1 call per year is planned. The measure has a duration of one week with 40 teaching units (UE). Four weeks before the start of the respective measure, the BFD Stuttgart checks whether there are sufficient registrations and informs the Contractor of the result by e-mail. The actual retrieval of the measure is then carried out by the AG in a timely manner. Claims for damages in the event of failure or non-occurrence of a measure are excluded. If necessary due to a high number of participants, it is possible for the client (but not the obligation) to have an additional measure of the same content carried out at the same place and under the same conditions in…

Show full description

… connection with the respective measure and in consultation with the contractor. CPV codes body (1): Adult education and other teaching (80400000) Place of performance Karlsruhe Information on lots Number, size and type of lots No lot allocation Admission of side offers No Provisions on the execution period Start: 28.06.2027 End: 31.12.2029 Comment on the deadline for execution: > Framework contract for 3 years with the extension option of up to 2 years according to § 15(4) UVgO, or § 21(6) VgV in conjunction with § 65(2) VgV., , 1 call is planned per year., The measure has a duration of one week with 40 teaching units (UE). , , Four weeks before the start of the respective measure, the BFD Stuttgart checks whether there are sufficient registrations and informs the AN of the result by e-mail. , , The actual call-up of the measure is then made in a timely manner by the AG., Claims for damages in the event of failure or non-occurrence of a measure are excluded., , If necessary due to high number of participants, it is possible for the AG (but not the obligation) to have an additional measure of the same content carried out in the same place and on the same terms and conditions in connection with the respective measure and in consultation with the AN. Amount of security required None 10. According to the terms and conditions of application (instalment and final payments within the framework of the General Terms and Conditions for Services Part B (VOL/B)) 11. Documents and requirements for assessing the suitability of the tenderer and the absence of grounds for exclusion n° 12. Award criteria

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published11 Oct 2026
ProcedureNational Öffentliche Ausschreibung
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Tender documents — direct download

These addresses come from the notice of the same tender on Öffentliche Vergabe (Datenservice) — they lead straight to the documents at the buyer, without registering on e-Vergabe des Bundes.
⤓
Annex
Further document

Contracting authority contact

·
Deadline — Thursday 5 November at 13:00

Tactics

This procedure allows 25 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on e-Vergabe des Bundes. The full specification and all annexes are there.
This procedure is published on 2 portals
Several sources carry the same notice.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via e-Vergabe des Bundes before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now