How to bid in this country: portals, deadlines, thresholds →
Construction work - Fire protection measures, penal institution Halle Geb. 2.0 + 3.1 + 3.4 (SLB-2026-0394)
Bauleistungen - Brandschutzmaßnahmen, Justizvollzugsanstalt Halle Geb. 2.0 + 3.1 + 3.4 (SLB-2026-0394) — original title
Your path to submission
- Deadline: 3 November at 11:30 — 2 days left.
- You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Building 2.0 Detention House ca.350+195m2 Protection Floors + Window Door Furnishings, ca. approx. 51m3 working/room scaffolding; ca. 12mDoor openings Make masonry or concrete stops with fall installation, ca.20m2 interior wall plasters incl. ground preparation, ca.60m slots close, ca.61m steel frames plastered, ca.28pieces wall openings plastered afterwards; ca.122+30m2 ceiling upgrade F30 and F90, ca.26m F30 cases dismantling and renewal, ca. 17m F90 steel girder flange cladding, ca. 55m2 F30 drywalls, ca. 4.5m F30 smoke extraction duct; Building 3.1 Kitchen ca.180+410m2 Protection Floors + Window Door Furnishings, ca.9+35m2 Dust Protection + Film Walls, ca. 260m3 Work / Room Scaffolding; ca.4m2masonry wall; ca.45pieces wall openings closed, ca.10m2 interior wall plasters incl. ground preparation, ca.35m slots closed, ca.32m steel frames plastered, ca.21pieces wall openings plastered…
Show full description
… afterwards; ca.11m2 F30 drywall, ca.11m2 RC2 drywall, ca.81m steel girder flange cladding of different widths, ca.3m2 F30 ceiling Building 3.4 Chamber+ Laundry ca.125+65m2 Protection floors + window-door furnishings, ca.30+25m2 Dust protection+foil walls, ca.50m2 Work roll or room scaffolding; ca.2.5m Door fence walls, ca. 1.25 m2 Ceiling steel concrete strips en, ca.2.0m2 Interior wall plaster including ground preparation, ca.35m Slits close, ca.68mSteel frame plaster, ca.18Pie wall breakthroughs plaster afterwards; ca.7m2 F90-dry walls, ca.4m2 F90-dry ceiling ca.45m F90-cases Geb. 2.0 Hafthaus realization period 11.01.26 to 25.08.27 on floors see Fbl. 214 Geb. 3.1 Kitchen Realisation period 15.02.27 to 19.03.27 (only temporary work 13-16 o'clock) Geb. 3.4 Chamber + laundry Realisation period 05.04.27 to 30.04.27 (working time as before)
Contract
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| H.O. Schlüter GmbH | 1 | 2026 |
Contracting authority contact
Tactics
This procedure allows 32 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). A normal window for this market.
Foreign bidders
In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now