Repair of roof damage at the "Francisco Fernández" municipal contemporary art center in Torreblascopedro, under Royal Decree 5/2026, of February 17, which adopts urgent measures in response to damage caused by various adverse meteorological phenomena, with particular impact in the autonomous communities of Andalusia and Extremadura
Reparación de daños en techo del centro municipal de arte contemporáneo "Francisco Fernández" de Torreblascopedro, en el marco del Real Decreto 5/2026, de 17 de febrero, por el que se adoptan medidas urgentes en respuesta a los daños causados por diversos fenómenos meteorológicos adversos, de especial afectación en las comunidades autónomas de Andalucía y Extremadura
Spain · Torreblascopedro · how to bid here →
Your path to submission
- Deadline: 13 October at 23:59 — 9 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The award came in at a median 43% of the estimated value (36 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 36
- 29% of this buyer's awards went to companies that had already won here before (73 awards since 2021, spread over 36 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 73 awards since 2021
- The median procedure drew just one bid (31 procedures with a bid count); 58% ended with a single bidder. Sector: median 4 bids.n = 31
- Not one of the 73 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 73
- From notice to award takes a median 24 days here (10 procedures). Sector: 16 days.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Spain · Construction work, 87 contracts went to foreign companies over the last 3 years (of 98,513 recorded awards) — mostly from Portugal, Italy, France.
Typical field: median 4 (from 15,043 awards).
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Cerrajería Isver, S.L. · Torreblascopedro | 7 | 2023–2026 |
| FRANCISCO JAVIER LOPEZ ALARCON | 5 | 2023–2025 |
| HORMIGONES PASTRANA | 4 | 2023–2026 |
| MATERIALES DE CONSTRUCCION PANCORBO SL | 4 | 2025–2026 |
| JOBLUX S.L.L. | 3 | 2023–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.