Friedrich & ClementBETA

Direction of Works Execution, Coordination in Safety and Health matters during the Works Execution phase and Quality Control during the Works Execution phase (by lots) for the comprehensive renovation of the workshops building at I.E.S. "Juan Bosco" in ALCÁZAR DE SAN JUAN (Ciudad Real).

Dirección de Ejecución de Obra, Coordinación en materia de Seguridad y Salud en fase de ejecución de obra y Control de Calidad en fase de ejecución de Obra (por lotes) para la Reforma integral del edificio de talleres en el I.E.S. "Juan Bosco" de ALCÁZAR DE SAN JUAN (Ciudad Real).

Spain · Toledo · how to bid here

Your path to submission

  1. Deadline: 30 September at 12:00 — 15 days left.
  2. You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (49 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to ESTUDIO DE ARQUITECTURA E INGENIERÍA INGETEO, S.L..n = 49
  • The median procedure drew just one bid (9,276 procedures with a bid count); 87% ended with a single bidder. Sector: median 6 bids.n = 9,276
  • 73% of this buyer's awards went to companies that had already won here before (10,263 awards since 2016, spread over 2,494 companies). That is well above the sector norm (43%) — newcomers have a harder time here than elsewhere.n = 10,263 awards since 2016
  • 50% of the bids received came from small and medium-sized enterprises (289 procedures with a bid mix). Sector: 78%.n = 289
  • The award came in at a median 86% of the estimated value (787 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 75%.n = 787

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide

Foreign bidders

In Spain · Architecture & engineering, 148 contracts went to foreign companies over the last 3 years (of 38,863 recorded awards) — mostly from France, Germany, Italy.

Typical field: median 5 (from 7,326 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

Eligibility analysis from the tender documents

Contract

BuyerSecretaría General de la Consejería de Educación, Cultura y Deportes de la Junta de Comunidades de Castilla-La Mancha
TypeServices
Estimated value117.547 €
Published14 September 2026
CategoryArchitecture & engineering · CPV 71200000

Who has won here before

CompanyAwardsPeriod
ALBERTO SANCHEZ RAMIREZ1422018–2026
INTEGRAL EVENTOS 2000 SLL1292017–2026
VIAJES HOLYMARTOUR, S.L. · TOLEDO 001182019–2026
SEGRADE, S.L. · TOLEDO 001152019–2026
FEDERICO PECES DIAZ · TOLEDO1032020–2023
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20239
20247
20257
202613

Who knows the rhythm prepares instead of reacting.

·
days until the deadlineWednesday 30 September at 12:00

How to bid

Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.

Open PLACSP — Plataforma de Contratación del Sector Público and search there for:
Dirección de Ejecución de Obra, Coordinación en materia de Seguridad y Salud en fase de ejecución de obra y Control de Calidad en fase de ejecución de Obra (por lotes) para la Reforma integral del edificio de talleres en el I.E.S. "Juan Bosco" de ALCÁZAR DE SAN JUAN (Ciudad Real).
We hold no notice number for this source — search by title or buyer.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Tenders like this, every morning at 7:30 in your inbox.
Register now →