Direction of Works Execution, Coordination in Safety and Health matters during the Works Execution phase and Quality Control during the Works Execution phase (by lots) for the comprehensive renovation of the workshops building at I.E.S. "Juan Bosco" in ALCÁZAR DE SAN JUAN (Ciudad Real).
Dirección de Ejecución de Obra, Coordinación en materia de Seguridad y Salud en fase de ejecución de obra y Control de Calidad en fase de ejecución de Obra (por lotes) para la Reforma integral del edificio de talleres en el I.E.S. "Juan Bosco" de ALCÁZAR DE SAN JUAN (Ciudad Real).
Spain · Toledo · how to bid here →
Your path to submission
- Deadline: 30 September at 12:00 — 15 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (49 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to ESTUDIO DE ARQUITECTURA E INGENIERÍA INGETEO, S.L..n = 49
- The median procedure drew just one bid (9,276 procedures with a bid count); 87% ended with a single bidder. Sector: median 6 bids.n = 9,276
- 73% of this buyer's awards went to companies that had already won here before (10,263 awards since 2016, spread over 2,494 companies). That is well above the sector norm (43%) — newcomers have a harder time here than elsewhere.n = 10,263 awards since 2016
- 50% of the bids received came from small and medium-sized enterprises (289 procedures with a bid mix). Sector: 78%.n = 289
- The award came in at a median 86% of the estimated value (787 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 75%.n = 787
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Spain · Architecture & engineering, 148 contracts went to foreign companies over the last 3 years (of 38,863 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 5 (from 7,326 awards).
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ALBERTO SANCHEZ RAMIREZ | 142 | 2018–2026 |
| INTEGRAL EVENTOS 2000 SLL | 129 | 2017–2026 |
| VIAJES HOLYMARTOUR, S.L. · TOLEDO 00 | 118 | 2019–2026 |
| SEGRADE, S.L. · TOLEDO 00 | 115 | 2019–2026 |
| FEDERICO PECES DIAZ · TOLEDO | 103 | 2020–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Dirección de Ejecución de Obra, Coordinación en materia de Seguridad y Salud en fase de ejecución de obra y Control de Calidad en fase de ejecución de Obra (por lotes) para la Reforma integral del edificio de talleres en el I.E.S. "Juan Bosco" de ALCÁZAR DE SAN JUAN (Ciudad Real).