"Design of the site "Implementation of construction and installation works for the implementation of energy efficiency measures - PVPP for own needs, lighting and distribution network measures, as well as improvement measures at the "Doctor Hristo Stambolski" EOOD Hospital, Kazanlak"

„Проектиране на обект „Изпълнение на СМР за внедряване на мерки за енергийна ефективност - ФЕЦ за собствени нужди, мерки по осветление и разпределителна мрежа, както и мерки по облагородяване в МБАЛ „Доктор Христо Стамболски“ ЕООД, гр. Казанлък“ — original title

BGBulgariaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 18 November at 23:59 — 18 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The purpose of this public procurement is to select contractors to prepare a project decision/investment project for municipal sites – MHAT “Dr. Hristo Stambolski” EOOD, Kazanlak. The subject of the public procurement includes the design of the site “Implementation of construction and installation works for the implementation of energy efficiency measures – PVPP for own needs, lighting and distribution network measures, as well as improvement measures at MHAT “Dr. Hristo Stambolski” EOOD, Kazanlak”: Preparation of a design solution by parts as follows: Construction - Constructive opinion; Electric - Sub-object PPP; Opinion on part EL /lighting/, including graphic material; HVAC/Opinion on part HVAC /distribution network/; Geodesy; Parking and Public Works. If necessary: Architecture, DB; NBP; PUSO. The design solution should take into account the energy efficiency audit of the building.…

Show full description

… Detailed bills of quantities shall be drawn up. The project decision should cover the implementation of the following measures of the EJN package: 1) Dismantling and replacement of the unreplaced lighting fixtures, as the new lighting fixtures are planned to be with LED lighting elements; 2) Delivery and installation of special thermal insulation elements on water-water heaters of the substation (AS) in the local boiler room, as well as on all exposed parts of the distribution network, including stopping fittings. Execution of mechanical lavage of AC heaters along their two circulation circuits; 3) Supply and installation of photovoltaic power plant (PVPP) for own needs, including the provision of storage units (batteries). The PV installation off-grid system 1x200,00 kWp to be built on the existing site in front of the building of the garages of the hospital, in close proximity to the main electrical panel, the transformer post and the available connection points. The self-consumption photovoltaic system shall have a total installed peak power of 200.00 kWp, overhead

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated value€7,669
Published28 Oct 2026
ProcedureПублично състезание

Type of service

71 · Architecture & engineering
CPV 71220000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (75 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to ДИН - З ЕООД.n = 75
  • 59% of this buyer's awards went to companies that had already won here before (457 awards since 2016, spread over 146 companies). That is well below the sector norm (71%) — this buyer switches suppliers more often than others.n = 457 awards since 2016
  • The award came in at a median 90% of the estimated value (29 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 29
  • The median procedure drew 2 bids (407 procedures with a bid count); 35% ended with a single bidder. Sector: median 2 bids.n = 407
  • 4% of awards went to companies from abroad (457 awards with a known winner country). Sector average: 0%.n = 457

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ЩРАБАГ ЕАД212024–2026
М-БРАДЪРС ООД172021–2026
БРИГАДА ЕООД162024–2026
ЕКИП - МГ ООД162024–2025
СК БИЛДИНГ АД142021–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

25
2024
29
2025
20
2026
74 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Wednesday 18 November at 23:59

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 67 completed awards — not a statement about this procedure.)

This procedure allows 22 days between publication and deadline — typical in this country is 30 (median of 1,785 procedures). A normal window for this market.

Foreign bidders

In Bulgaria · Architecture & engineering, 7 contracts went to foreign companies over the last 3 years (of 12,820 recorded awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ЦАИС ЕОП before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now