How to bid in this country: portals, deadlines, thresholds →
“Supply and installation of four modular containers for the needs of the Water Center at the site “Development of the tourist potential of the Koprinka Dam – construction of Bike Park and Water Center” in PI 38563.31.423 under the KKKR of the village of Koprinka”
„Доставка и монтаж на четири модулни контейнера за нуждите на Воден център към обект „Развитие на туристическия потенциал на язовир „Копринка“ – изграждане на Байк парк и Воден център“ в ПИ 38563.31.423 по КККР на с. Копринка“ — original title
Your path to submission
- Deadline: 5 November at 23:59 — 5 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the public procurement is the supply and installation of four modular containers for the needs of the Water Center at the site “Development of the tourist potential of the Koprinka Dam – construction of Bike Park and Water Center” in PI 38563.31.423 under the KKKR of the village of Koprinka. The four modules are designed for storage, which warehouse is formed by two joined modular structures, an office with a bathroom for people with disabilities representing a separate modular structure and changing rooms representing a separate modular structure. Delivery and installation, as well as internal distribution in modular structures should be carried out in accordance with the attached design documentation. The scope of the contract includes the delivery, unloading, positioning and installation of container modular buildings intended to separate the necessary premises for the functioning of the Water Center, according to the design documentation.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 9 months (3 awards, most recently May 2026) — the next award is due around January 2027 by that rhythm. The last award went to ПЪТПРИБОР ООД.n = 3
- The award came in at a median 90% of the estimated value (29 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 69%.n = 29
- 59% of this buyer's awards went to companies that had already won here before (457 awards since 2016, spread over 146 companies). 41% went to new names.n = 457 awards since 2016
- The median procedure drew 2 bids (407 procedures with a bid count); 35% ended with a single bidder. Sector: median 2 bids.n = 407
- 0% of the bids received came from small and medium-sized enterprises (92 procedures with a bid mix). Sector: 16%.n = 92
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ЩРАБАГ ЕАД | 21 | 2024–2026 |
| М-БРАДЪРС ООД | 17 | 2021–2026 |
| БРИГАДА ЕООД | 16 | 2024–2026 |
| ЕКИП - МГ ООД | 16 | 2024–2025 |
| СК БИЛДИНГ АД | 14 | 2021–2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 30 (median of 1,785 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Bulgaria · Construction materials, 1 contract went to a foreign company over the last 3 years (of 2,148 recorded awards).
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now