How to bid in this country: portals, deadlines, thresholds →
Schweinfurt, Kornacherstraße 6, 330-Other exterior walls/Vert. Baukonstr., exterior
Schweinfurt, Kornacherstraße 6, 330-Sonstige Außenwände/Vert. Baukonstr., außen — original title
Your path to submission
- Deadline: 12 November at 08:00 — 11 days left.
- You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
concrete In front of the main entrance of the employment office in Schweinfurt there is an underground concrete structure with a floor area of about 120 m2. The building is a former fire-fighting water reservoir, which is currently accessible via two shafts. The fire-fighting water reservoir is to be converted into an ice storage tank for heating the employment office. In this context, concrete refurbishment and waterproofing work must be carried out on the structure. The works will be carried out in two separate construction phases. Between the Both construction phases will take several months, as in the meantime the building technology for the ice storage will be installed. Most of the work is carried out in the first construction phase. The following services are in the 1. Construction phase planned Construction site installation - Construction site installation including building…
Show full description
… electricity and water - Lighting in the building - Ventilation construction - Traffic safety for construction site installation area New mounting opening For the installation of the building technology for the ice storage, a larger mounting opening with a diameter of 150 cm is required. For this purpose, the following work will be carried out: - Open spaces terrain - Removal and lateral storage of the topsoil - Construction of an excavation pit with a floor area of 3 m x 3 m and a depth of about 1.90 m incl. installation - makeshift support in the building - Cutting a round opening with a diameter of 200 cm into the barrel vault - Excavation and disposal of the free-cut circular concrete disc - Making a corrugated reinforcing ring of reinforced concrete in the incised Opening incl. bonding of reinforcement into the stock - Loose installation of a reinforced concrete shaft cover with a diameter of 180 cm, in which a smaller opening with a diameter of 60 cm is integrated. (The cover is initially placed only loosely so that it can be lifted from other trades.) - Temporary covering of the smaller opening Measures Incumbent manholes The existing shafts are to be maintained in order to use them for ventilation purposes. The following work is to be carried out on the existing shafts: - Dismantling of shaft covers of existing shafts - New reinforced concrete manhole covers in in-situ concrete construction incl. gluing of Reinforcement - Execution of ventilation pipes through the manhole covers - Masonry refurbishment at the masonry northern shaft - seepage strips of gravel around the new shaft covers Measures Concrete repair - Cleaning and removal of loose parts of the coating inside the structure - Removal of swollen bitumen on joints - removal of hollow layers and damaged areas in the floor slab, on the vault and on the walls - removal of hollow layers and damage to the hollow throat between the base plate and the vault - Reprofiling of damaged and defective areas, including surface preparation and application Adhesive bridge - Rigid pressing of the longitudinal cracks in the barrel vault - Rigid pressing of the cracks in the base plate - Tensile compression of the cracks in the cross joints - Cutting of the transverse joints in the base plate Measures Sealing - Installation of a vapour brake as a separation layer from the concrete substrate - Sealing of the structure from the inside with loosely laid plastic sealing membranes o incl. welding of the webs o incl. edge and corner formations o Including sealing of the pump sump o incl. installation of vent valves o incl. mechanical edge attachment outside the water level - Inspection of welds - Laying an additional protective layer on the floor After the end of the 1. The construction site installation can be dismantled during the construction phase. All that is required is the installation and the fencing of the installation until the end of the 2. construction phase. After the end of the 1st The technology of the ice storage system is then installed during the construction phase. For this purpose, the loosely placed shaft cover must be able to be removed from other trades. If the technology is built into the memory, the second follows. construction phase. The following measures are set out in 2. Bauabschni
Contract
Type of service
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| T. Werner Bau Sanierung GmbH | 1 | 2026 |
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 230,099 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now