How to bid in this country: portals, deadlines, thresholds →
Supply performance of fire detection components
Lieferleistung von Brandmeldekomponenten — original title
Your path to submission
- Deadline: 5 November at 09:30 — 4 days left.
- You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
1. Brandmeldekomponenten 1.1. Sensoren und Melder
Contract
Clement What the numbers say about this buyer
- 65% of this buyer's awards went to companies that had already won here before (109 awards since 2023, spread over 39 companies). That is well above the national norm (45%) — newcomers have a harder time here than elsewhere.n = 109 awards since 2023
- The median procedure drew just one bid (107 procedures with a bid count); 68% ended with a single bidder. Country: median 3.1 bids.n = 107
- Across 8 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (8 of 8), Minimum number of managers (8 of 8), Share of subcontractors (8 of 8), Average minimum annual turnover (8 of 8).n = 8
- 1% of awards went to companies from abroad (109 awards with a known winner country). National average: 1%.n = 109
- From notice to award takes a median 73 days here (28 procedures). Country: 86 days.n = 28
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| FEI Deutschland GmbH | 6 | 2025 |
| sysGen gmbh · Bremen | 6 | 2024–2026 |
| InfraTec GmbH · Dresden | 5 | 2025 |
| Werth Messtechnik GmbH · Gießen | 5 | 2025 |
| Rittal GmbH & Co. KG · Herborn | 4 | 2024 |
Contracting authority contact
Tactics
This procedure allows 21 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now