Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

WWV/INV/N34Y/1/S2 Study N34y De Haan-Wenduine - Refurbishment and softening of the N34 / from project memorandum to layout design and build file

WWV/INV/N34Y/1/S2 Studie N34y De Haan-Wenduine - Herinrichting en ontharding van de N34 / van projectnota tot opmaak design and build dossier — original title

BEBelgiumBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 3 December at 10:00 — 32 days left.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The present assignment includes drawing up a project note and preparing a specification for the implementation file for a later realization following the formula Design and Build. The contract concerns the Nieuwe Rijksweg N34y between kilometre point 4.9 and kilometre point 8.0 and the Koninklijkebaan N34 between kilometre point 17.6 and kilometre point 21.0.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published28 Oct 2026
ProcedureOpen procedure

Type of service

71 · Architecture & engineering79 · Business services75 · Public administration72 · IT services73 · R&D services
CPV 71000000 · 79930000 · 75130000 · 79420000 · 72242000 · 73110000 · 79410000 · 79400000

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (14 awards since 2022, spread over 4 companies). 100% went to new names.n = 14 awards since 2022
  • The median procedure drew 4 bids (9 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 9
  • 7% of awards went to companies from abroad (14 awards with a known winner country). Sector average: 16%.n = 14

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Samenwerkende Organisatie van Gespecialiseerde Aannemers12022
ABOG NV12022
BVBA ADEDE12022
Willemen Infra NV12022
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2022
26
2024
20
2025
27
2026
74 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Thursday 3 December at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,324 completed awards — not a statement about this procedure.)

This procedure allows 36 days between publication and deadline — typical in this country is 34 (median of 3,181 procedures). A normal window for this market.

Foreign bidders

In Belgium · Architecture & engineering, 280 contracts went to foreign companies over the last 3 years (of 2,188 recorded awards) — mostly from France, Germany, Netherlands.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on BDA / e-Procurement Belgium. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BDA / e-Procurement Belgium before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now