How to bid in this country: portals, deadlines, thresholds →
LIE3013B - Lier, Bril, Volmolenstraat, Werf and others: Renovation of the existing sewerage system.
LIE3013B - Lier, heraanleg Bril, Volmolenstraat, Werf e.a: Renovatie van de bestaande riolering. — original title
Your path to submission
- Deadline: 27 November at 11:45 — 26 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Contract
Type of service
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (15 awards since 2022, spread over 4 companies). That is well below the sector norm (15%) — this buyer switches suppliers more often than others.n = 15 awards since 2022
- The median procedure drew 3 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 10
- 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 11%.n = 15
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Tender documents at a glance
The essentials of the tender documents, read in seconds. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
The input text concerns a Belgian public works contract for Aquafin NV (with Pidpa as mede‑opdrachtgever) for renovation works to existing sewers, governed by Belgian and EU public procurement law (Wet Overheidsopdrachten 2016, KB Plaatsing 2017, KB Uitvoering 2013). The country perspective is clearly Belgium: it refers to Belgian recognition categories (C1/E1, klasse 4), Belgian labour law (minimum wages, ketenaansprakelijkheid voor derdelanders, Limosa), Belgian social security and fiscal rules, and EU-wide concepts like the Uniform Europees Aanbestedingsdocument and eIDAS electronic signatures. The contract is framed within Aquafin’s internal procedures (Standaardbestek 200, 250, Aquafin aanvullingen, veiligheidsreglement, klantentevredenheid/aannemerscore).
The text specifies in detail what the bidder must submit and which minimum qualification requirements apply. Such as, under Art. 78 the offer must include: the completed inschrijvingsbiljet; the samenvattende opmetingsstaat in both Excel and PDF (with only limited allowed changes to VH-quantities and prices, and with the PDF prevailing if contradictory); documents required for selection and gunning; and proof of signing authority (statutory documents or volmachten). Additional mandatory attachments include: a signed verklaring naleving minimumlonen; a signed verklaring Vlaamse ketenaansprakelijkheid bij tewerkstelling van illegaal verblijvende derdelanders; documents for checking uitsluitingsgronden and selection criteria (including VCA-certificering or equivalent); a note on closure periods for annual leave and inhaalrust (art. 27§1 KB uitvoering); and, if requested by the veiligheidscoördinator, a completed safety document describing execution method, preventive measures and related costs, plus a signed intentieverklaring Veiligheids‑ en Gezondheidsplan by both contractor and subcontractors. Technical capacity is mainly proven via Aquafin’s “aannemerscore” (kwaliteit) according to the separate Klantentevredenheid bijlage: for this non-specifiek project, a minimum aannemerscore of 0 applies and “instappers” (without sufficient prior evaluations) may participate; recognition requirement is category C1 or E1, class 4. For specific projects, the separate procedure with higher minimum scores (e.g. 26) and possible referentiedossiers for instappers is described in the klantentevredenheid document, but the bestek itself fixes here a minimum score of 0 for this transportprojecten score dated 01/20/26.
Show the full summary (6 paragraphs)
The scope of the contract is defined as renovation of existing sewers in Lier (Volmolenstraat/Werf-Bril) under project nr. LIE3013B, with one, non-divided lot (Art. 58: geen opdeling in percelen). Such as, the works consist of: renovating existing rioleringen; installing new access and connection pits; making existing underground pits accessible and finishing them; dealing with house connections (via Pidpa’s project portal and huisaansluitingsfiches); and coordinating with utilities when conflicts are found (e.g. cables through the sewer after frezen). The tender makes clear that the camera footage and plans provided are indicative; bidders must obtain and base their offer on available camerabeelden and perform a mandatory plaatsbezoek (with attestation to be attached). Quantities are given in the detailed meetstaat; VH (vermoedelijke hoeveelheden) may be corrected by the bidder. The execution period is 60 working days, with possible suspension if liners are not available, but only if the manufacturer supplies verifiable evidence; the contract is mixed: partly global price (GP) and partly unit price list (VH). Geotechnical data (sonderingen, peilbuizen) and other technical plans are annexed and form part of the specifications that bidders must factor into their price and method statements.
Award criteria and weighting are straightforward: the gunningscriterium is the economically most advantageous offer on the basis of price alone (Art. 81: EMVI op basis van de prijs). There are no variants or options allowed (Art. 56). While “kwaliteit” via aannemerscore is used as a selection criterion (technische of beroepsbekwaamheid) and not as a gunningscriterium, the klantentevredenheid bijlage explains how Aquafin calculates and updates the aannemerscore from half-yearly werfevaluaties (14 questions per fiche, equal weighting, NPS-based score, with recent performance weighted heavier over a three-year window). Such as, the document clarifies that for non-specifieke projects the bestek will state a minimum score (here 0) and allow instappers; for specifieke projects there can be a higher minimum (e.g. 26) with a two-stage procedure (selectie, then gunning among typically 5 best scorers) and possible use of references by instappers. However, for this specific bestek, the operative award decision will be made purely on lowest price among the offers that meet all administrative and technical requirements.
The text also details numerous risks and special conditions that bidders must factor in. Such as, subcontracting is regulated: information on subcontractors must be provided via the Uniform Europees Aanbestedingsdocument; for foreign subcontractors, the main contractor must supply proof for uitsluitingsgronden (fiscal, social debts, criminal record) immediately, as Aquafin cannot retrieve these itself. Safety requirements strongly condition subcontractor use: only activities of risk level 1 may be subcontracted if the main contractor has VCA** and subcontractors either possess a VCA (or equivalent MASE/SCC) certificate or comply with specific VCA diploma requirements (VOL‑VCA for leaders, VCA-basis for operational staff; stricter rules for zelfstandigen met/zonder risicovolle machines). Insurance and liability are special: Aquafin provides a comprehensive Alle Bouwplaatsrisico’s (ABR) policy covering all construction partners, but all damage up to the ABR deductible (EUR 2,500 per case) and parts of groundwater-related losses remain at the contractor’s expense, with per-project caps depending on class (e.g. EUR 45,000 for class 4). The client does not take out a 10‑year liability policy; the contractor remains liable for ten years after provisional acceptance and may decide whether to insure that risk. There is an extended payment term of 60 calendar days split into 30 days verification and 30 days payment, and specific electronic procedures for vorderingsstaten and invoicing (via Aquafin’s email and Pidpa’s project portal). The verbintenistermijn for tenders is 180 days. Presence registration obligations, Limosa notifications, A1 forms, visas and work permits for foreign workers are emphasised, with fines for missing electronic attendance registration. Safety and pandemic measures are deemed included in prices, and the contractor cannot claim extras for implementing the project-specific Veiligheids‑ en Gezondheidsplan (VGP). All persons working on Aquafin sites must, by 01/01/2027, hold a valid QR code obtained via the Contractoraanmeldingsplatform after a safety introduction test.
Finally, the documents address inconsistencies and determine which statements prevail in case of contradictions. Such as, for the bid price forms, if the Excel and PDF samenvattende opmetingstaat differ, the PDF is deemed to reflect the bidder’s true intention and is legally binding. The klantentevredenheid bijlage describes both a generic non-specifiek wording (minimum score 0; instappers allowed) and a separate template for specifieke projecten with higher minimum score (e.g. 26); the bestek itself explicitly sets the applicable minimum score for this project at 0 and thus overrides the generic “26” example. Similarly, while the klantentevredenheid document describes more complex two-stage procedures for specifieke projecten, the main bestek confirms that this particular assignment is under the European threshold, not split into lots, and awarded via an onderhandelingsprocedure met voorafgaande bekendmaking on price only. In practice, whenever the annexed procedure text gives model formulations that differ from the concrete parameters in Art. 68 or elsewhere in the bestek, the tailored provisions in the bestek (e.g. “minimum aannemerscore 0”, “geen percelen”, “gunning op basis van prijs”) are the operative ones.
Only the contracting authority's tender documents are binding. As of: 28/10/2026
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Mols Contractors | 1 | 2022 |
| Smet GWT Europe | 1 | 2022 |
| Colas Noord | 1 | 2022 |
| Deckx Algemene Ondernemingen | 1 | 2022 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 1,540 completed awards — not a statement about this procedure.)
This procedure allows 31 days between publication and deadline — typical in this country is 34 (median of 3,181 procedures). A normal window for this market.
Foreign bidders
In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Italy.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now