Crèche La Ribambelle SB - Insulation of the ceiling from the technical vacuum

Crèche La Ribambelle SB - Isolation du plafond du vide technique — original title

BEBelgiumBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline for requests to participate: 9 November at 23:55 — 9 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published8 Oct 2026
Procedures_neg_w_call_24_81

Type of service

45 · Construction work
CPV 45000000

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (42 awards since 2017, spread over 21 companies). That is well below the sector norm (15%) — this buyer switches suppliers more often than others.n = 42 awards since 2017
  • The median procedure drew 2 bids (24 procedures with a bid count); 38% ended with a single bidder. Sector: median 4 bids.n = 24
  • 19% of awards went to companies from abroad (42 awards with a known winner country). Sector average: 11%.n = 42

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Crèche La Ribambelle – Isolation du plafond du vide technique (Marché public 2026/237)

The input text concerns a Belgian public works contract launched by the Ville de La Louvière (Province du Hainaut, Belgium) for construction-type works in a crèche.

The country point of view is clearly Belgian: the documents refer extensively to Belgian legislation on public procurement (loi du 17 juin 2016, AR du 18 avril 2017, AR du 14 janvier 2013), labour law, social dumping and safety on temporary or mobile construction sites.

The contracting authority is a Belgian municipality and the place of performance is in Wallonia (Strépy-Bracquegnies).

As background, the market is a works contract titled “Crèche La Ribambelle SB – Isolation du plafond du vide technique”, passed under a “procédure négociée directe avec publication préalable” because the estimated amount is below 750,000 EUR HTVA.

The text sets out, among others, the administrative provisions for tendering, contractual execution rules, a technical description, and specific safety and well‑being clauses.

It clarifies that, unless otherwise stated, the Belgian Royal Decree of 14 January 2013 on execution of public contracts applies, and it stresses that the authority aims to fight social dumping and social fraud in the context of this market.

Regarding what the bidder must submit and the minimum qualification requirements, the offer must be drawn up in French using the annexed “formulaire d’offre” and “métré récapitulatif”, fully completed and signed electronically via the e‑Procurement platform.

When a mandataire signs, a copy of the relevant powers or statutes must be attached.

The offer must also include the completed site visit certificate (Annexe B: attestation de visite) and all documents required to assess technical conformity (for example, such as technical documentation and attestations of conformity for materials and installations).

For qualitative selection, there is no financial capacity requirement, no turnover threshold and no agréation needed, but the bidder must provide at least three references for polyurethane projection insulation works executed in the last three years, each of a minimum value of 10,000 EUR HTVA, with amounts, dates and clients (public or private).

The city will verify tax and social debt via Télémarc and may exclude operators whose debt exceeds 3,000 EUR unless they have approved payment plans or offsetting claims.

Show all 47 statements

The adjudicator also checks exclusion grounds under articles 67–69 of the 2016 law and may request a criminal record extract less than six months old from the bidder deemed to be awarded the contract.

The adjudicataire must contract insurances covering work accidents and civil liability towards third parties.

Concerning the scope of the contract (what, how much, where, when), the object is the insulation of the ceiling of a technical void in the “Crèche com ‘La Ribambelle’”, located Rue de la Ribambelle 5, 7110 Strépy‑Bracquegnies.

The market is divided into tranches: a firm tranche (Tranche 1 – horizontal surfaces and 20 cm downstands on vertical walls) and a conditional tranche (Tranche 2 – an additional 70 cm on vertical walls).

The detailed quantities and technical specifications are in Chapter III (not fully reproduced here but referenced).

As for timing, the contractual execution period is 2 calendar days on site (Friday and Saturday), excluding delivery lead times, with start date to be fixed with the contracting authority.

Execution is currently foreseen in autumn 2027, after completion of renovation works on hydraulic pipes.

The warranty period is 12 calendar months starting from provisional acceptance.

Offers must be submitted electronically via https://www.publicprocurement.be by the deadline indicated in the contract notice; they are valid for 180 calendar days from the offer submission deadline.

Payment is made once, after provisional acceptance, within 30 days of receiving the declaration of claim, the detailed statement of works and the electronic invoice (PEPPOL XML), with monthly progress payments possible only if an extension of time is granted.

On award criteria and weighting, the text specifies that price is the sole award criterion: the authority will choose the economically most advantageous offer based only on price.

No variants or options (free, mandatory or authorised) are allowed.

The conclusion of the contract covers the whole market but only commits the authority for firm tranches; conditional tranches are subject to a later decision.

Prices are “marché mixte” under article 2 of the AR of 18 April 2017, must be in euros, and include all charges except VAT.

The authority reserves the right to review prices that appear abnormally low or high and may request written justifications within 12 days (or a longer period it sets); it may also use external information for this analysis, which will be communicated to the bidder for comments.

As to risks and special conditions, the documents impose a series of obligations regarding social dumping, subcontracting, safety and penalties.

Subcontractors may be used, and their capacities can be relied on for selection, but the adjudicataire remains fully responsible and must seek prior approval for additional subcontractors.

It is forbidden for a subcontractor to subcontract the whole task or to keep only coordination; an additional subcontracting tier is possible only under unforeseeable circumstances or with written approval.

All subcontractors must not be in exclusion situations and must respect social and labour obligations.

The contracting authority can order immediate stop of work by any non‑compliant subcontractor (order of service) with all consequences at the adjudicataire’s risk.

For workers not under Belgian social security, LIMOSA (L1) and A1 documents must be provided before they start on site; no worker may be housed on site, and their residence addresses must be communicated if housing is provided elsewhere.

The contract contains strong clauses against social fraud: if the adjudicataire or any subcontractor employs illegal third‑country nationals or seriously fails to pay wages on time, the company must immediately stop working on site until evidence of rectification is given, is considered in default, and has a reduced defence period (5 working days) under article 44 RGE.

In addition, serious breaches may lead to measures of office and sanctions like exclusion from future markets or agréation sanctions (article 48 AR 14 January 2013).

Defects in execution (for example, such as not meeting contractual conditions, not respecting deadlines, ignoring written orders, or breaching environmental/social/labour obligations) are recorded by procès‑verbal and must be remedied without delay; failure can trigger sanctions under articles 45–49 and 86–88 of the AR of 14 January 2013.

The safety and risk section (SIPP clauses) provides a detailed risk analysis for a crèche environment.

It identifies, for instance, risks after works (such as insufficient insulation, finger trapping, ergonomic discomfort, water/air tightness defects, noise and lighting issues, allergies, odours, biological risks, vandalism) and risks during works (such as dust, noise, electrical hazards, transport and handling risks, chemical risks, cuts, falls, and interactions between children, staff and workers).

As a preventive measure, works should normally be carried out during the crèche’s annual closure to avoid risks related to children.

The bidder, by submitting an offer, confirms that it can manage the identified and any additional known risks, in compliance with European rules, RGPT, and the Code du bien‑être au travail; it must supply safety data sheets, fire behaviour documentation and installation conformity attestations before installation.

The text also stresses amiante (asbestos) management: an inventory is annexed or available on request; the bidder must inform its staff of any asbestos presence and, if it sees a potential danger, propose appropriate treatment measures including associated costs.

The adjudicataire must inform the authority about inherent risks and mitigation measures, cooperate in site coordination, and, where multiple interveners are present, be able to appoint a safety and health coordinator and prepare required plans.

Specific obligations are set out for accident reporting, cooperation with prevention services (SIPP), and for fire safety (placement and signalling of extinguishing equipment as per articles III.3‑17 and III.3‑18 of the Code).

No special contractual guarantees (cautionnement) are required, there is no price revision, and no advances are granted given the short execution period.

With respect to contradictions or corrections within the documents, the text repeatedly states that there are no derogations, precisions or comments (Néant) to the standard regulatory framework, and it confirms that, unless otherwise specified, the law of 17 June 2016 and the ARs of 18 April 2017 and 14 January 2013 apply.

Where timing conflicts could be inferred (execution period fixed at 2 days but currently planned in autumn 2027), the binding contractual rule is the 2‑day execution period; the calendar reference (“prévue à l’automne 2027”) is indicative of planning and remains subject to coordination with the contracting authority.

Overall, when in doubt, the explicit clauses in the Cahier spécial des charges and the referenced Belgian legal provisions take precedence.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 25/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
DE BODT Eric12025
EVODIS12026
Ethias12026
ARTER---Bureau d'études Poly-tech Engineering---Carré 7---Mariotti & associés---Pirnay12022
Normec BTV12024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

45
2024
77
2025
50
2026
172 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 9 November at 23:55
Deadline for requests to participate

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 1,540 completed awards — not a statement about this procedure.)

This procedure allows 32 days between publication and deadline — typical in this country is 34 (median of 3,233 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Netherlands.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on BDA / e-Procurement Belgium. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BDA / e-Procurement Belgium before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now