Project 23.379B/1 - Design & Build, RWZI Geel Sludge Densification

Project 23.379B/1 - Design & Build, RWZI Geel Slibdensificatie — original title

BEBelgiumBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 30 November at 10:00 — 29 days left.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published28 Sept 2026
Procedureeform-E1

Type of service

45 · Construction work
CPV 45232420

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (15 awards since 2022, spread over 4 companies). That is well below the sector norm (15%) — this buyer switches suppliers more often than others.n = 15 awards since 2022
  • The median procedure drew 3 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 10
  • 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 11%.n = 15

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Aquafin RFI – Hydraulische uitbreiding RWZI Geel met slibdensificatietechnologie

The input text contains Aquafin’s Request for Information (RFI) concerning the hydraulic and biological expansion of the municipal wastewater treatment plant RWZI Geel in Belgium.

It is clearly positioned as a non‑binding market consultation, preceding a future public procurement procedure under Belgian and EU public procurement rules, and is written from the point of view of a Belgian contracting entity (Aquafin NV, based in Aartselaar, Belgium).

No other countries are mentioned; the context is Flemish wastewater infrastructure and Belgian overheidsopdrachten legislation.

Aquafin explains that this RFI is a preparatory market study, not an actual tender.

As such, bidders are not yet asked to submit a formal offer, pricing, or binding commitments.

Instead, Aquafin seeks high‑level information from potential contractors about experience, approaches, and possible technological solutions for a future Design & Build (D&B) assignment.

The company stresses that participation in the RFI is voluntary, free of charge, and creates no rights or expectations regarding later award.

The RFI aims to gather input on topics such as experience and references, planning and project follow‑up, guarantees on effluent norms, process automation, operational support, financial stability/TCO, internal structure and cooperation, compliance with public procurement rules, certifications, and innovation and sustainability.

Regarding what the bidder must submit and minimum qualification requirements, the text does not specify classic tender requirements such as minimum turnover, insurances or specific certificates as award or selection conditions.

Instead, it prescribes the structure of the RFI response: (1) “Informatie indiener” with a concise company presentation and overview of products/services, (2) “Toelichtingen bij vragen” answering all questions in Annex 2, and (3) “Vrije documenten” as supporting documentation.

Aquafin asks for detailed qualitative information on, such as, experience with municipal wastewater treatment under highly diluted conditions, D&B/E&C projects, slibdensificatie technologies (process steps, ability to reach MLSS ≥ 6 g/L and SVI ≤ 80 L/g, compact footprint, fully above‑ground implementation), methodology for planning and project control, guarantees and remedial measures for effluent norms, automation concepts (including coupling to Aquafin’s AX and Derdack systems), exploitation support, financial analysis and TCO considerations, internal capacity and use of subcontractors, familiarity with overheidsopdrachten legislation, available certifications (e.g.

VCA, aannemerserkenningen), and innovative/ sustainable or modular solutions.

Show all 34 statements

These are information requests, not formal minimum requirements, but clearly foreshadow future qualification and evaluation aspects.

On the scope of the contract, the text describes the intended future project rather than a finalized contract.

The hydraulic expansion of RWZI Geel will raise the peak flow capacity from 1,100 m³/h to 2,732 m³/h for 42,500 IE.

This is to be achieved via two projects: (1) renovation of the existing “klassieke straat” (including a new influent pump sump sized for total capacity and sludge treatment via an indiktafel, plus a common tertiary treatment for both streets, which is explicitly stated as out of scope of this RFI), and (2) a new second biological street to be procured via D&B.

The scope for the second street comprises, such as, a fully new above‑ground water line from the shared influent pump pit to the production of secondary effluent meeting current discharge norms and ready for tertiary treatment or direct discharge.

The design must use slibdensificatie technology, minimize footprint, limit dewatering needs and underground pipework, and treat approximately 60% of the influent via the new street and 40% via the existing street.

The site is described as a “greenfield” adjacent to the current RWZI Geel, which allows design without major constraints from existing structures.

Timelines in the document relate only to the RFI response: written high‑level answers are requested before 12 November 2026, with optional follow‑up meetings on 17, 19 and 23 November 2026.

As to award criteria and weighting, the text explicitly states that this RFI is not a call for tenders and will not be used to evaluate or rank companies for award.

Aquafin notes that the information will be used solely to build technical specifications and contractual requirements for a possible later overheidsopdracht.

Consequently, there are no defined award criteria, no weighting matrix, and no scoring system in this RFI.

On risks and special conditions, the document does not yet define contractual penalties, guarantees, bonding levels, subcontracting rules, offer validity periods, or maintenance obligations.

It does, however, highlight several risk‑related aspects that Aquafin wants market input on.

For example, bidders are asked how they will guarantee effluent norms and process requirements at all times, including during implementation, and what remedial measures they propose if guarantees are not met, as well as how process continuity is ensured if the offered solution underperforms.

They are queried on, such as, long‑term reliability of electromechanical equipment (e.g. minimum 15 years of reliable operation and post‑15‑year guarantees), exploitation support formulas, and how they manage continuity when subcontractors fail.

Subcontracting and partnerships are addressed through questions about which studies/works are done in‑house, which via known subcontractors, and which external collaborations exist; but no binding restrictions or percentage limits are given.

The procedure‑related conditions that are defined concern questions and meetings: all RFI correspondence must be in Dutch via email to Koen Dockx at Aquafin, there is a clear deadline for written answers (12 November 2026), and optional oral meetings can only be held if a complete written response has been submitted.

There is no mandatory site visit described in the text; the site is described mainly via figures and layout plans.

With respect to contradictions or corrections, the text is consistent on key procedural points: it repeats several times that the RFI is non‑binding, not a tender, and that participation or non‑participation has no impact on future eligibility or award.

Where certain scopes are mentioned multiple times (such as the common tertiary treatment of effluent of both streets being out of scope for this project), the statements are aligned and reinforce each other rather than contradict.

The only potentially confusing aspect for a reader concerned with formal tender rules is that some questions in Annex 2 (e.g. on certifications, financial stability, TCO) resemble selection or award criteria, but the document clearly states that the responses will not be used for any form of evaluation or exclusion in this phase.

Therefore, if a conflict were suspected, the explicitly repeated clauses stating that this is merely a market consultation and not an invitation to submit an offer or binding proposal would prevail.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 26/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Mols Contractors12022
Smet GWT Europe12022
Colas Noord12022
Deckx Algemene Ondernemingen12022
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

5
2022
408
2024
391
2025
453
2026
1,257 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 30 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 1,540 completed awards — not a statement about this procedure.)

This procedure allows 63 days between publication and deadline — typical in this country is 34 (median of 3,181 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on BDA / e-Procurement Belgium. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BDA / e-Procurement Belgium before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now