WA/INV/N26/4/S2 - Study of traffic handling with traffic light control environment Margareta complex Mechelen
WA/INV/N26/4/S2 - Studie verkeersafwikkeling met VRI omgeving Margaretacomplex Mechelen
Belgium · how to bid here →
Your path to submission
- Deadline: 27 October at 11:15 — 22 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 7% of awards went to companies from abroad (14 awards with a known winner country). Sector average: 29%.n = 14
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2022, spread over 4 companies). 100% went to new names.n = 14 awards since 2022
- The median procedure drew 4 bids (9 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · Business services, 722 contracts went to foreign companies over the last 3 years (of 3,084 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 5 (from 1,964 awards).
What the buyer is looking for
In the context of the construction of the new Arsenal connection in Mechelen, the client wishes to coordinate the traffic management of the Margareta Tunnel and the various intersections in the area with each other and with traffic in different operating states. In order to do this, microsimulations, lighting arrangements and V-plans (with the necessary detection) must be developed, which must also be tested and adjusted if necessary. These arrangements should, in addition to the organisation of a normal operational traffic management, intervene as a matter of priority in the event of calamities, with the aim of evacuating the tunnels in a safe manner and still maintaining a safe and relatively smooth traffic management in the vicinity during calamities, so that the emergency services are minimally impacted during the interventions. The VRI installations must therefore all work…
Show full description
… technically correct and very robust, with the necessary fail safe guarantees. The assignment includes the traffic study up to and including the drawing up of the V-plans, as well as monitoring and, if necessary, adjustment after implementation. The services include • A full traffic study; • The layout of lighting arrangements; • Extensive microsimulations; • The layout of V-plans; • Aftercare for 5 years after implementation.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BVBA ADEDE | 1 | 2022 |
| Samenwerkende Organisatie van Gespecialiseerde Aannemers | 1 | 2022 |
| Willemen Infra NV | 1 | 2022 |
| ABOG NV | 1 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.