Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Theatre of Martyrs – displacement of rooftop ventilation groups

Théâtre des Martyrs – déplacement des groupes de ventilation en toiture — original title

BEBelgiumBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline for requests to participate: 9 November at 10:00 — 8 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Le présent marché de travaux consiste en la mise en conformité urbanistique de l’implantation des installations techniques placées en toiture. Des travaux ont été entrepris de 2023 à 2025 ; corresponding au réaménagement intérieur du théâtre et à sa mise aux normes de sécurité incendie, incluant l’installation de groupes techniques en toiture. And parallèle, Urban transmettait une mise en demeure en raison de la non-conformité de l’installation technique en toiture avec le permis unique du 02/10/2023 (04/PFU/1867798). Le projet finalisé prévoit dès lors : • the reculer le nouveau groupe technique fresh l’arrière, pour diminuer visuellement la hauthor du groupe par rapport à l’angle de vision depuis la place ; un puits de lumière avec dôme en plastique du toit plat sera condamné et le groupe reculé le plus en arrière possible par rapport à tous les gainages qui courent sur cette toiture…

Show full description

… plate • d’installer des écrans visuels rectilignes devant les parties encore émergentes ou toujours visibles des gaines techniques et les peindre dans des teintes de finitions identiques aux éléments architecturaux présents dans leur environnement visuel immédiats. Mesures générales • L’attention de l’entrepreneur est attirée sur le fait que le bâtiment et le site sont classés • L’entrepreneur exécute ses travaux en veillant constamment à perturber le moins possible les utilisateurs et à éviter tous risques d'accidents et de dégâts aux personnes et biens. • L'entrepreneur est tenu de se conformer aux instructions du fonctionnaire dirigeant ou de son représentant pour le présent marché, and ce qui concerne l'ordre et la sécurité. And cas de contraventions graves ou répétées, la Commission Communautaire Française peut exiger le remplacement du responsable du chantier ou de tout membre du personnel du soumissionnaire voire de son/ses sous-traitants. • L'entrepreneur est tenu, and accord avec la police locale, de prendre toutes les mesures nécessaires au cas où ses activités occasionneraient des gênes ou entraves au trafic ou au stationnement. • L’entrepreneur fait procéder à ses frais à l’établissement contradictoire des états des lieux (sous forme de photos) et en remet une copyie au Maître de l’Ouvrage avant le commencement des travaux. Address : place des Martyrs 22 à 1000 Bruxelles

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published23 Sept 2026
Procedures_neg_w_call_24_81

Type of service

45 · Construction work
CPV 45331210

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (42 awards since 2015, spread over 22 companies). That is well below the sector norm (15%) — this buyer switches suppliers more often than others.n = 42 awards since 2015
  • The median procedure drew 2 bids (29 procedures with a bid count); 24% ended with a single bidder. Sector: median 4 bids.n = 29
  • 17% of awards went to companies from abroad (42 awards with a known winner country). Sector average: 11%.n = 42

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
PROCONTROL12026
- Lepage mobiliers srl12024
SOMATI FIE12026
MD SAFETY12025
Verrax sa Demuynck12024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

6
2024
8
2025
4
2026
18 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 9 November at 10:00
Deadline for requests to participate

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 1,540 completed awards — not a statement about this procedure.)

This procedure allows 47 days between publication and deadline — typical in this country is 34 (median of 3,233 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Netherlands.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on BDA / e-Procurement Belgium. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BDA / e-Procurement Belgium before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now