How to bid in this country: portals, deadlines, thresholds →
Ecohydrological study kikbeek and sbz mechelse heide
Ecohydrologische studie kikbeek en sbz mechelse heide — original title
Your path to submission
- Deadline: 30 October at 14:00 — 12 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Offer and evidence in: Dutch.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The reason for the start of the ecohydrological study is the stability problems in the lake Kikbeek, as a result of which the level increases in relation to the achievement of the conservation objectives cannot currently continue. To investigate the effects of higher plas levels (than the current ones) in the Kikbeek quarry on the surrounding groundwater-dependent vegetations, the ecohydrological study is being carried out. Additional measures for rewetting in the Mechelse Heide, Ziepbeekvallei, Neerharerheide and Asbeek Habitats Directive area are also being investigated in order to achieve a climate-robust system. The aim of the study is to investigate the impact on groundwater levels and the environmental conditions resulting from increases in the level of the lake Kikbeek and hydrological restoration measures in the Mechelse Heide, Ziepbeek, Neerharerheide and Asbeek. This should…
Show full description
… lead to maximising the restoration and maintenance of groundwater-dependent vegetation. The aim is to achieve climate-robust system restoration, without hypothesizing the critical infrastructure (such as the E314 motorway) and the long-term stability of the Berg quarry and the Kikbeekplas. The preparation of hydrological and ecological model predictions should serve to investigate scenarios for level rise in the lake Kikbeek and to develop and evaluate the development of wet nature in the Mechelse Heide Habitats Directive area.
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (95 procedures with a bid count); 22% ended with a single bidder. Sector: median 5 bids.n = 95
- 12% of awards went to companies from abroad (122 awards with a known winner country). Sector average: 29%.n = 122
- 0% of this buyer's awards went to companies that had already won here before (122 awards since 2015, spread over 19 companies). 100% went to new names.n = 122 awards since 2015
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 18/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Bert Plasmans | 1 | 2022 |
| Anrob NV | 1 | 2022 |
| Krinkels NV | 1 | 2022 |
| Windey NV | 1 | 2022 |
| Dolmans Landscaping BV | 1 | 2022 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,994 completed awards — not a statement about this procedure.)
This procedure allows 71 days between publication and deadline — typical in this country is 33 (median of 3,131 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Belgium · Business services, 726 contracts went to foreign companies over the last 3 years (of 3,096 recorded awards) — mostly from France, Germany, Italy.
Submission language: Dutch.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now