Construction of the Al-Bakri Green School for Girls in Hebron
Construction de l'école verte pour filles Al-Bakri à Hébron — original title
Your path to submission
- Deadline: 19 November at 13:00 — 18 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Contract
Type of service
Clement What the numbers say about this buyer
- 54% of awards went to companies from abroad (119 awards with a known winner country). Sector average: 11%.n = 119
- In this sector the buyer awards roughly every 2 months (10 awards, most recently November 2025) — by that rhythm the next award was due around February 2026. The last award went to BA Management SUARL.n = 10
- The median procedure drew 8 bids (94 procedures with a bid count); 5% ended with a single bidder. Sector: median 4 bids.n = 94
- 2% of this buyer's awards went to companies that had already won here before (119 awards since 2018, spread over 93 companies). That is well below the sector norm (15%) — this buyer switches suppliers more often than others.n = 119 awards since 2018
- Across 3 procedures with structured selection criteria, this buyer most often required: References: services (3 of 3), Average minimum annual turnover (3 of 3), Staff qualifications (2 of 3), Equipment, plant and technical facilities (1 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Public works tender for construction of Al‑Bakri Green Girls’ School in Hebron
The input text concerns a Belgian‑law public works contract launched by Enabel (the Belgian development agency) for the construction of the Al‑Bakri Green Public Girls’ School in Hebron, Palestine.
The documents apply Belgian public procurement rules (Law of 17 June 2016 and Royal Decree of 18 April 2017) to a project implemented in the West Bank, with specific tax and evaluation rules for tenderers registered in Palestine, Israel, or internationally.
The point of view is that of a Belgian contracting authority procuring construction services in Palestine, with references to local Palestinian regulations (e.g.
The tender sets out detailed data to be included in the bid, such as mandatory use of specific forms: Identification form, List of subcontractors, Annual turnover, Tender form – Prices, Proposed personnel, Similar assignments/references, Declaration on honour on exclusion grounds, Integrity Statement, and the European Single Procurement Document (ESPD).
The ESPD is compulsory and its absence is explicitly defined as a “substantial irregularity” making the tender void.
Where capacity of other entities or subcontractors is relied upon, separate ESPDs and written commitments are required for each such entity.
In case of a group of economic operators (association/joint venture), each member must provide its own identification form, exclusion declaration, statutes/powers of attorney, association agreement naming the lead entity, and ESPD.
Qualitative selection criteria cover aptitude to exercise the professional activity (official registration), economic and financial capacity (such as a minimum annual turnover of EUR 4 million, which can be met collectively in an association, with fixed exchange rates for turnover calculation), and technical and professional aptitude (such as staff qualifications including a Green Building Expert, and references for similar executed projects over a defined reference period corrected via Errata).
Tenderers must attach all documents requested in the Selection file and those needed for award criteria application, and the contracting authority may directly obtain certain official data for Belgian tenderers via Telemarc, except criminal record extracts.
Insurance and performance bond requirements are listed under “Financial guarantees”, and the contractor must demonstrate financial solvency and carry appropriate insurance, though detailed sums are defined elsewhere in the specifications.
The scope of the contract is a single, non‑divided works contract for the construction of the Al‑Bakri Green Girls’ School, CPV 45214200‑2, at Block 34425, Al‑Sha’ba area, Parcel 232 in Hebron, on land owned by Hebron Municipality (approx. 6,160 m²).
The contract consists of all items in the Tender form – Prices and Annex 1 Bill of Quantities; it is not split into lots and partial bidding is not allowed.
Show all 30 statements
It is a price‑schedule contract where only unit prices are fixed and the amount payable results from applying unit prices to quantities actually performed, such as those later determined in order forms.
Presumed quantities in the price form are indicative only.
The duration is 15 months from award notification; actual performance starts from the date set in an order form, and the contract may not be renewed.
All prices must be quoted in EUR excluding VAT, with local tax regime applicable; evaluation methodology distinguishes tenderers registered in Palestine (prices evaluated without VAT) and Israel (prices evaluated including VAT), and this rule has been clarified and slightly expanded by Q&A and modifications.
Award criteria are purely price‑based: the sole criterion is “Price” with a weight of 100%, using a formula such as Points for tender A = (amount of lowest tender × 100) / amount of tender A. Only regular tenders from bidders that pass qualitative selection are compared.
Regularity checks identify substantial irregularities, such as failure to comply with mandatory legal provisions, failure to meet minimum or explicitly “substantial” requirements, or failure to submit the ESPD, and even accumulation of non‑substantial irregularities can render a tender void.
The contracting authority may decide not to award the contract or to restart the procedure.
The contract is deemed concluded upon notification of award; contract documents comprise the tender specifications and annexes, the approved tender, the registered award letter, and any later signed amendments.
Risks and special conditions are extensively addressed.
The tender validity period is 90 days from submission deadline.
No bid bond is required, but a performance bond and insurances apply under Articles 24–33 of the GIR.
The contract forbids variants and options.
Subcontracting is allowed under the selection rules, but subcontractors whose capacity is used are subject to exclusion checks and must provide commitments and ESPDs; in certain cases the contracting authority may directly replace the main contractor by its subcontractor(s) or the second‑ranked tenderer via an amendment, without a new procedure, in case of termination or ex officio measures.
Penalties are detailed, such as automatic daily penalties of EUR 250 per day for non‑delivery of documents, absence from site/coordination meetings, delayed execution of orders, unapproved changes of key staff, absence of required engineers/full‑time staff, or failure to comply with labour, safety, and field office requirements.
Other sanctions include exclusion from Enabel contracts for up to three years.
Strict technical control, preliminary and ex‑post inspections, mandatory documentation and “as built” plans, EDGE and PHGBC documentation, and refusal of non‑compliant materials are all included as performance risks.
The procedure includes a planned site visit (optional but highly encouraged) on 21 July 2026, and an online information session on 22 July 2026.
Where discrepancies exist between earlier statements and later Errata or Q&A answers (such as about greywater, GFA, reference periods for similar assignments), the latest Errata/Q&A and “Modified – Rev” versions of the tender documents prevail, and tenderers are explicitly instructed to submit their offers after reading and incorporating all published corrections.
Only the contracting authority's tender documents are binding. As of: 25/10/2026
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| GFA Consulting Group GmbH | 2 | 2025 |
| GOPA Partners in Action for Change and Engagement · Brussels | 2 | 2024–2025 |
| DITEF | 1 | 2025 |
| Avenir Médical | 1 | 2025 |
| Philippe Vrijghem | 1 | 2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 8 or more bids came in. Many compete here — price and references decide. (Based on 8 completed awards — not a statement about this procedure.)
This procedure allows 127 days between publication and deadline — typical in this country is 34 (median of 3,181 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Italy.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now