Friedrich & ClementBETA

Guide · Back to the overview

How much competition does a tender for Architecture & engineering in Slovenia face?

A median of 2 bids per procedure; 40% of procedures ended with a single bidder (620 awards with a bid count). National average for Slovenia across all sectors: 5.7 bids.

Search open tenders in this sector · Country guide Slovenia

The market norm in numbers

MetricSectorNational averageSample
Bids per procedure (median)25.7620
Procedures with a single bidder40 %19 %620
Awards to a repeat winner40 %41 %1,158
Distinct winners4055,6721,170
Awards to companies from abroad6 %6 %1,170
Award relative to estimate (median)97 %90 %480
Notice to award (median)0
Bids from SMEs133 %399 %620
Bids from abroad1 %7 %620
Weight of price in award criteria (median)0

How to read these numbers

Of 29 sectors in Slovenia with a bid count, Architecture & engineering ranks 16 for competition. Every second tender effectively ends without competition — showing up often wins. 40% of awards went to companies that had already won with the same buyer — buyers switch often here.

Other sectors in the same country

Frequently asked questions

How many bidders does a tender for Architecture & engineering in Slovenia get?

A median of 2 bids per procedure, measured on 620 awards with a bid count since 2024. 40% of procedures had a single bidder.

How often does the incumbent win in Slovenia?

40% of awards in Architecture & engineering went to a company that had already won with the same buyer.

Do foreign companies stand a chance in Slovenia for Architecture & engineering?

6% of awards went to companies based outside Slovenia.

What share of the estimate does the winner get in Architecture & engineering?

The award came in at a median 97% of the estimated value.

How much does price count for Architecture & engineering in Slovenia?

Not enough weighted notices for this sector yet.

Where the numbers come from

From the documented awards of every portal we read (TED and the national portals), aggregated every night. Bid counts come from the award notices themselves (TED BT-759, PLACSP, OCDS, Hilma, ANAC); incumbency counts whether the winner had won with the same buyer before; abroad means the winner's country differs from the buyer's. Metrics below the minimum sample are not shown.

As of 08/09/2026 · n = 1,170