Friedrich & ClementBETA

Stadtverwaltung Worms, Abt. 6.4 Zentrale Ausschreibungsstelle und Dienste

Germany · 3 open tenders · 293 awards with a known winner

How to bid in this country: portals, deadlines, thresholds →

Purchasing rhythm

Tenders published per year — who knows the rhythm prepares before the notice appears.

20218
2022127
2023230
2024473
2025460
2026264

Clement What the numbers say about this buyer

  • 58% of this buyer's awards went to companies that had already won here before (280 awards since 2024, spread over 115 companies). That is well above the national norm (45%) — newcomers have a harder time here than elsewhere.n = 280 awards since 2024
  • The median procedure drew 3 bids (280 procedures with a bid count); 32% ended with a single bidder. Country: median 3.1 bids.n = 280
  • 90% of the bids received came from small and medium-sized enterprises (139 procedures with a bid mix). Country: 75%.n = 139
  • Across 11 procedures with structured selection criteria, this buyer most often required: Share of subcontractors (11 of 11), Staff qualifications (8 of 11), Equipment, plant and technical facilities (8 of 11), References: works (7 of 11).n = 11
  • 0% of the bids received came from other countries (139 procedures with a bid mix) — all bidders, not just the winners. Country: 3%.n = 139
  • 1% of awards went to companies from abroad (280 awards with a known winner country). National average: 1%.n = 280
  • From notice to award takes a median 83 days here (78 procedures). Country: 86 days.n = 78

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 33% of 26,069 closed expectation windows produced a notice.

  • Nov 2026Petroleum & fuels
    about every 3 months · 5 awards · last Aug 2026 to Ternis Umwelt- und Landschaftspflege GmbH
  • Nov 2026Architecture & engineering
    about every 2 months · 72 awards · last Oct 2026 to Rittmannsperger Architekten GmbH
  • Nov 2026Construction work
    about every month · 137 awards · last Oct 2026 to GT Fußbodentechnik

Who has won here before

CompanyAwardsPeriod
ITG Ingenieurbüro Techn. Geb. GmbH · Lorsch132024–2026
Motoren Baader GmbH · Neustadt92024–2026
Erwin Wegener Gmbh · Westhofen82024–2026
ZÖLLER - KIPPER GmbH · Mainz62024–2025
Rauh GmbH · Memmingen-Steinheim62024–2026
SSV Architekten52024–2025
Truschel Elektrotechnik GmbH · Worms52025–2026
Kai Laumann Zimmerei u. Bedachungs-GmbH · Wettenberg52024–2025
Arbeiter-Samariter-Bund LV Rheinland-Pfalz e.V. Kreisverband Worms/Alzey · Worms52024–2025
Lehmann Ausbau GmbH & Co. KG42024–2026

From 18.4M documented awards · regular winners know this buyer's requirements — that is your competition.

New tenders from this buyer — in your inbox at 7:30 every morning.
Register now →