Construction of PLP L53 Y.Hever - Y.Dijlebrug
Deadline 7 Oct ·
57/43/3/26/118 Projects North – Power Distribution & Substations. Groundworks (excavation and earthworks, cable installation, cable routes/pulling pits/concrete trenches, boxes and lighting pylons). Framework Agreement. Lot 1: East and West Flanders Provinces. Lot 2: Antwerp, Limburg and Flemish Brabant Provinces.
Deadline 7 Oct ·
57/43/3/26/118 Projects North – Power Distribution & Substations. External Works (excavation and earthworks, cable installation, cable routes/pull pits/concrete trenches, cabinets and lighting pylons). Framework Agreement. Lot 1: East and West Flanders Provinces. Lot 2: Antwerp, Limburg and Flemish Brabant Provinces.
Deadline 7 Oct ·
57/52/2/25/028 - Masterplan Hasselt 2027: Renewal of tracks, track equipment, overhead lines and signalling installations (L34/L21)
Deadline 21 Oct ·
57/52/3/26/055 - Region 3: Port of Antwerp-Ghent Replacement of railway materials with revision of the relevant tracks and track equipment in the sidings and main tracks in the station facilities. Lot 1: Section 1 Maintenance Antwerp-Haven Lot 2: Section 2 Maintenance Antwerp-Haven Lot 3: Section Maintenance Ghent-Seaport. Framework Agreement.
Deadline 21 Oct ·
57/54/2/26/082 - Technical interventions on Infrabel buildings in the regions of Mechelen, Leuven and Hasselt. Framework agreement.
Deadline 4 Nov ·
57/52/3/26/164 - Vegetation management at various sites of Maintenance Regions 1, 2 and 3 – Framework agreement
Deadline 4 Nov ·
57/43/2/25/037 - "Maintenance contract for lighting installations former Area North-East (Antwerp – Limburg – Flemish Brabant)"
Deadline 18 Nov ·
Bijstand bij onderhoud aan de trieerinstallaties te Antwerpen-Haven
Deadline 18 Nov ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

202438
202544
202650

Clement What the numbers say about this buyer

  • The median procedure drew 5 bids (29 procedures with a bid count); 7% ended with a single bidder. Country: median 3.4 bids.n = 29
  • 13% of this buyer's awards went to companies that had already won here before (56 awards since 2023, spread over 44 companies). 87% went to new names.n = 56 awards since 2023
  • 13% of awards went to companies from abroad (56 awards with a known winner country). National average: 26%.n = 56
  • Across 33 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (31 of 33), Staff qualifications (3 of 33), References: works (1 of 33), Technical staff for execution (1 of 33).n = 33

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 10,807 closed expectation windows produced a notice.

  • Aug 2026Architecture & engineering
    about every 1 months · 4 awards · last Jul 2026 to Monument Vandekerckhove
  • Sept 2026Construction work
    about every 2 months · 32 awards · last Jul 2026 to Eiffage Energie Systèmes-Infra NV
  • Dec 2027Agricultural services
    about every 15 months · 9 awards · last Sept 2026 to NV Vande Vijvere Fyto

Who has won here before

CompanyAwardsPeriod
MOBIX32024–2025
JACOPS NV32023–2025
Strukton Rail NV22025
TM TDV22025
Krinkels NV22024–2026
TranzCom NV12024
Stadsbader Rail NV12025
Kontron AIS GmbH12025
EQOS Energie Belgium NV12024
Cegelec Infra technics12025

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.