Euskal Trenbide Sarea - ETS - Euskal Trenbide Sarea
Spain · 7 open tenders · 146 awards with a known winner
How to bid in this country: portals, deadlines, thresholds →
Current tenders
Work on the Bilbao Railway Southern Bypass. Phase 1. Section: Orconera-Durañona
€66,295,539Deadline 2 Nov ·
Work on the Bilbao Southern Railway Bypass. Phase 1. Section: Durañona-Burtxako
€77,910,723Deadline 2 Nov ·
Cable maintenance service for ETS communication and signalling facilities
€874,350Deadline 2 Nov ·
ETS Electronic Network OT Maintenance Service
€696,000Deadline 9 Nov ·
Support service for the management of the signalling works of the Zumaia garages, Altzola variant and new interlockings in Itsasbegi and Mundaka - Bermeo
€360,000Deadline 9 Nov ·
Track maintenance and civil works service for ETS tram lines
€4,358,453Deadline 16 Nov ·
Support Service for the Management of Construction Projects of the Southern Railway Variant of Bilbao. Phase 1. Sections: Orconera - Durañona and Durañona - Burtxako
€3,640,560Deadline 11 Dec ·
Purchasing rhythm
Tenders published per year — who knows the rhythm prepares before the notice appears.
20211
202260
202343
2024107
2025167
2026177
Clement What the numbers say about this buyer
- 19% of this buyer's awards went to companies that had already won here before (253 awards since 2021, spread over 99 companies). That is well below the national norm (54%) — this buyer switches suppliers more often than others.n = 253 awards since 2021
- The median procedure drew 2 bids (183 procedures with a bid count); 34% ended with a single bidder. Country: median 1.1 bids.n = 183
- 38% of the bids received came from small and medium-sized enterprises (85 procedures with a bid mix). Country: 66%.n = 85
- The award came in at a median 76% of the estimated value (66 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 87%.n = 66
- 5% of awards went to companies from abroad (253 awards with a known winner country). National average: 0%.n = 253
- 0% of the bids received came from other countries (85 procedures with a bid mix) — all bidders, not just the winners. Country: 4%.n = 85
- Across 21 procedures with structured selection criteria, this buyer most often required: Minimum turnover in the contract field (21 of 21), References: services (14 of 21), References: works (7 of 21).n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Expected next awards
From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 33% of 26,069 closed expectation windows produced a notice.
- Oct 2026Installation services
about every 8 months · 5 awards · last Feb 2026 to INGENIERIA DE SISTEMAS Y TELEMANDO, S.A.U - Oct 2026Construction work
about every 2 months · 12 awards · last Aug 2026 to UTE BYCAM + A.URIA + JAIZUBIA BURTXAKO RIO CASTAÑOS - Nov 2026Repair & maintenance
about every 4 months · 31 awards · last Jul 2026 to AMETSA REHABILITACIONES SOCIEDAD LIMITADA - Dec 2026Architecture & engineering
about every month · 54 awards · last Oct 2026 to DAIR INGENIEROS, S.L. - Jan 2027Transport equipment
about every 3 months · 12 awards · last Oct 2026 to VOESTALPINE RAILWAY SYSTEMS JEZ S L
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TÉCNICA Y PROYECTOS, S.A. | 8 | 2024–2026 |
| SAITEC, S.A. | 6 | 2024–2026 |
| EPTISA-CINSA INGENIERÍA Y CALIDAD, S.A. | 6 | 2024–2026 |
| MONTAJES ELÉCTRICOS SAN IGNACIO, S.L. | 5 | 2025–2026 |
| CAF TURNKEY & ENGINEERING, S.L. | 4 | 2024–2026 |
| ARCELORMITTAL ESPAÑA S A | 3 | 2024–2025 |
| Indra Sistemas, S.A. · 28850 ES | 3 | 2024–2025 |
| GAIMAZ INFRAESTRUCTURAS Y SERVICIOS, S. A. | 3 | 2024 |
| VOESTALPINE RAILWAY SYSTEMS JEZ SL | 3 | 2024–2025 |
| TRAVIESAS Y PREFABRICADOS DE ARAGÓN, S.L. | 2 | 2024–2025 |
From 18.4M documented awards · regular winners know this buyer's requirements — that is your competition.
New tenders from this buyer — in your inbox at 7:30 every morning.
Register now →