DIREZIONE GRANDI OPERE APPALTI / CONTRATTI
Italy · 6 open tenders
Current tenders
Open procedure for the assignment of technical engineering and architecture services for the Preparation of the Technical-Economic Feasibility Project (PFTE), Executive Design (PE), Safety Coordination in the Design Phase (CSP) with the option of Works Direction (DL) and Safety Coordination in the Execution Phase (CSE) for the intervention called Renaturalization
554.943 €Deadline 4 Sept · 15 days left
Open procedure for the assignment of technical services of engineering and architecture for the Drafting of the Technical and Economic Feasibility Project (PFTE), Executive Design (PE), Safety Coordination in the Design Phase (CSP) with the option of Site Management (DL) and Safety Coordination in the Execution Phase (CSE) for the intervention called Coastal Park Sa
330.596 €Deadline 4 Sept · 15 days left
Open Procedure for the Assignment of Technical Engineering and Architecture Services for the Preparation of the Technical-Economic Feasibility Project (PFTE), Executive Design (PE), Safety Coordination in the Design Phase (CSP) with the option of Works Direction (DL) and Safety Coordination in the Execution Phase (CSE) for the intervention called Rehabilitation of
626.034 €Deadline 4 Sept · 15 days left
Open procedure for the assignment of technical services for engineering and architecture for the preparation of the Technical-Economic Feasibility Project (PFTE), Executive Design (PE), Safety Coordination in the Design Phase (CSP) with the option of Works Direction (DL) and Safety Coordination in the Execution Phase (CSE) for the intervention called Parco Costiero Sa
330.596 €Deadline 11 Sept · 22 days left
Open procedure for the assignment of technical engineering and architecture services for the Preparation of the Technical-Economic Feasibility Project (PFTE), Executive Design (PE), Safety Coordination in the Design Phase (CSP) with the option of Works Direction (DL) and Safety Coordination in the Execution Phase (CSE) for the intervention called Renaturalization
554.943 €Deadline 11 Sept · 22 days left
Open procedure for the assignment of technical engineering and architecture services for the Preparation of the Technical-Economic Feasibility Project (PFTE), Executive Design (PE), Safety Coordination in the Design Phase (CSP) with the option of Works Direction (DL) and Safety Coordination in the Execution Phase (CSE) for the intervention called Requalification d
626.034 €Deadline 11 Sept · 22 days left
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
20251
202613