Installation, maintenance and removal of a provisional pumping system for water at the low point located at KP 630+685 of the High-Speed Line belonging to the platform works section Sagrera-Nudo de la Trinidad
59.549 €BELOW THRESHOLDDeadline 28 Aug · 8 days left
Consulting and technical assistance for the control of works for the construction project of the new overpass and pedestrian walkway over the railway in Martutene, Madrid-Hendaya Line, Municipal Term of Donostia/San Sebastián (Gipuzkoa).
565.073 €Deadline 28 Aug · 8 days left
Technical assistance services for the coordination of safety and health in the construction works of railway lines in the Zamora-Galicia section.
1.423.700 €Deadline 28 Aug · 8 days left
Execution works for the construction project of roof repair of the Hypostyle Hall of Puerta de Atocha Station, Madrid.
3.068.161 €BELOW THRESHOLDDeadline 31 Aug · 11 days left
Execution works for the slope stabilization project through mesh placement on embankments in the surroundings of the Íllora electrical substation of the Antequera-Granada H.S.R. without affecting traffic circulation
948.799 €BELOW THRESHOLDDeadline 3 Sept · 14 days left
Consulting and technical assistance services for the control and supervision of the works for the upgrading of the Vandellós traction substation.
297.145 €Deadline 3 Sept · 14 days left
Services for drafting the Phase Plan for the expansion and improvement of Barcelona Sants Station integrated into the new city model (Barcelona)
1.035.000 €Deadline 4 Sept · 15 days left
Supply and installation of an automatic chlorination system for legionella control in security facilities buildings. Section Lleida-Figueres High Speed
124.678 €BELOW THRESHOLDDeadline 7 Sept · 18 days left
Renewal of uninterruptible power supply systems in all technical buildings of the H.S.L. Madrid – Barcelona – French border, section Lleida – Barcelona.
1.192.750 €Deadline 7 Sept · 18 days left
Works for the simplified project for the new reorganisation of boarding and baggage control operations on the High-Speed trains of Córdoba - Julio Anguita.
157.104 €BELOW THRESHOLDDeadline 8 Sept · 19 days left
Works for the simplified project to improve the facilities of the Villanueva de Córdoba - Los Pedroches station
89.744 €BELOW THRESHOLDDeadline 8 Sept · 19 days left
Works for the simplified project for the adaptation of auxiliary spaces at Seville Santa Justa station
75.424 €BELOW THRESHOLDDeadline 8 Sept · 19 days left
Drafting of the constructive project for adaptation to regulations of the fire protection installation at Cáceres station
41.239 €BELOW THRESHOLDDeadline 8 Sept · 19 days left
Consulting and technical assistance services for the execution of works for the construction project to replace the hot axle box detection system on High-Speed lines
184.476 €BELOW THRESHOLDDeadline 14 Sept · 25 days left
Installation and supply service for bearing plates: Antequera maintenance base - section from kilometer point 73+000 to 120+500 of the Málaga-High Speed Junction to María Zambrano high-speed line.
2.085.369 €Deadline 14 Sept · 25 days left
Execution of works for the construction project for the adaptation of parking and maneuvering roads at Sevilla Santa Justa station
1.797.070 €BELOW THRESHOLDDeadline 18 Sept · 29 days left
Supply and transport of mixed rail-laying machines and necessary components for the incorporation of guard rails in metal sections of the standard gauge implementation on the Astigarraga - Irún route.
1.134.063 €Deadline 21 Sept · 32 days left
Supply and transport of expansion devices for the assembly of the high-speed railway line Madrid - Extremadura - Portuguese border. Section: Talayuela-Plasencia.
1.542.335 €Deadline 21 Sept · 32 days left
Execution works for the treatment project of tunnels No. 1 Mirabel 1, No. 2 Mirabel 2, No. 8 río Tajo 6, No. 9 río Tajo 7 and No. 10 río Tajo 10, between PP.KK. 271+297 and 302+179, on Line 500 Planetarium Junction - Casa de LaTorre Junction, Section Monfragüe - Cáceres (Cáceres).
5.056.280 €BELOW THRESHOLDDeadline 25 Sept · 36 days left
Technical assistance services for the coordination of safety and health in the construction works of railway lines in the Palencia-Cantabria section
1.101.700 €Deadline 1 Oct · 42 days left
Execution works for the project "Erosion control of the three cuts located between km 135+450 and km 136+920 of the H.S.R. Madrid - Zaragoza - Barcelona - French Border"
460.179 €BELOW THRESHOLDDeadline 2 Oct · 43 days left
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
201853
201958
202070
2021106
2022114
2023234
2024266
2025289
2026286
Who has won here before
| Company | Awards | Period |
|---|---|---|
| AYESA ARCHITECTURE · Sevilla | 41 | 2018–2026 |
| SGS TECNOS SA · ALBACETE | 28 | 2019–2025 |
| INGENIERÍA Y PREVENCIÓN DE RIESGOS, S.L. | 23 | 2017–2025 |
| SAITEC, S.A. | 19 | 2019–2026 |
| Técnica y Proyectos S.A. - TYPSA · San Sebastián de los Reyes | 14 | 2019–2026 |
| Esteyco, S.A | 13 | 2019–2026 |
| ECINGEN S.L. · Ciudad Real | 13 | 2021–2026 |
| Ricardo Certification Iberia SL · Madrid | 12 | 2017–2025 |
| GENERA QUATRO SL | 12 | 2020–2024 |
| voestalpine Railway Systems JEZ SLU | 12 | 2021–2026 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.