How to bid in this country: portals, deadlines, thresholds →
KSP Emil-Bredt-Weg - General Refurbishment
KSP Emil-Bredt-Weg - Generalsanierung — original title
Your path to submission
- Deadline: 12 November at 12:00 — 11 days left.
- You submit on evergabe.NRW — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Type of service Landscaping work Scope of service The playground on the Emil-Bredt-Weg in Essen Bergeborbeck is to be refurbished and will offer an extended range of services for children in the future. The area includes a generous fall protection area with fall protection sand as well as a marginal greening of lawn and shrub plantations. The existing passageway is currently unevenly designed and consists of concrete pavements, concrete slabs and a partially preserved water-bound path ceiling. In the course of the redesign of the children's playground, a uniform and barrier-free passageway is made of concrete pavement. The south-facing access to the playground, which is currently not barrier-free due to a single concrete level, will be trained without a level in the future through adapted height planning. The sand playing area is slightly enlarged by the new route. In addition, the…
Show full description
… playground is equipped with various inclusive play equipment. In conjunction with barrier-free access, this creates a range of games that enable children with different needs to use them on an equal basis. Sensory game boards, an inclusive sand and climbing device with slide and a funnel telephone take into account the requirements of children with motor, auditory or visual impairments. At the same time, all play equipment is selected in such a way that it can be used equally by children with and without disabilities. In addition to the new play equipment, the existing play equipment, a quadruple rocker, a double rocker and a rotary gyroscope will be integrated into the new design and repositioned at suitable locations. The existing swing remains at its previous location. A new sand play table and a toddler spring bouncer expand the range for toddlers. They are arranged in such a way that they are easily visible from the three planned benches along the new path. The sand play area is framed by concrete rimstones and in sections by concrete wall panels, which serve as a tactile and perceptible demarcation in the sense of a wheel deflector to improve accessibility. A new tree planting in the southeastern edge area is to create additional quality of stay and provide shade in the future. Along the western property border with the neighboring property, new shrub plantings are also planned to spatially hold the playground and visually conceal the fence system there. The entire playground is surrounded by a fence, which will be preserved in the future. The existing access barriers will be replaced in the south by a gate system and in the north by new rotating gate barriers. Access to the construction project is permitted with equipment and machines up to 7.5 t. Storage facilities must be coordinated with the responsible construction management and secured independently. Damage caused by the contractor to paths, vegetation or other furnishings or equipment must be repaired by the contractor at his own expense. All services include the delivery of the associated materials and components, including unloading and storage on the construction site, unless otherwise stipulated in the specifications, as well as recycling or landfilling in accordance with the Circular Economy Act. When stating "dispose" or "transport to landfill" in a service text, the payment of the landfill fees or the recycling costs must always be taken into account as part of the service and in the calculation of the unit prices. Deviating regulations are expressly pointed out in the text. Where no make is entered in items in which make proposals and equivalents are approved, the proposed make shall be deemed to have been offered. The contractor must carry out the work in his own company. With written Zusti
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (11 awards, most recently June 2026) — by that rhythm the next award was due around September 2026. The last award went to Banzhaf Gartenbau GmbH.n = 11
- 39% of this buyer's awards went to companies that had already won here before (155 awards since 2018, spread over 92 companies). 61% went to new names.n = 155 awards since 2018
- From notice to award takes a median 374 days here (98 procedures). Sector: 84 days.n = 98
- The median procedure drew 5 bids (128 procedures with a bid count); 10% ended with a single bidder. Sector: median 4 bids.n = 128
- Across 5 procedures with structured selection criteria, this buyer most often required: References: services (5 of 5), Quality control by institutes (1 of 5).n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Schröer Garten- u.Landschaftsbau | 10 | 2026 |
| Banzhaf Gartenbau GmbH | 9 | 2024–2026 |
| Browo GmbH · Berlin | 6 | 2020–2026 |
| Terra Verde GmbH · Grasellenbach | 5 | 2023–2026 |
| Fendesack Forst-und Kulturbau GmbH · Rheine | 5 | 2024–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 11 completed awards — not a statement about this procedure.)
This procedure allows 16 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now