Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

New construction indoor sports accommodation Edisonstraat

Nieuwbouw binnensportaccommodatie Edisonstraat — original title

NLNetherlandsBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 12 January 2027 at 10:00 — 72 days left.
  2. You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The proposed contract concerns the construction of a new indoor sports facility on the Edisonstraat in Maastricht. For a detailed description of the present contract, please refer to the attached STABU specifications with specification number 1812 incl. Underlying specifications (installations and RAW) and accompanying annexes.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published27 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45210000 · 45212225

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (17 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Besix Infra Nederland B.V.n = 17
  • 5% of this buyer's awards went to companies that had already won here before (366 awards since 2015, spread over 187 companies). That is well below the sector norm (18%) — this buyer switches suppliers more often than others.n = 366 awards since 2015
  • The median procedure drew 3 bids (299 procedures with a bid count); 24% ended with a single bidder. Sector: median 4 bids.n = 299
  • The award came in at a median 90% of the estimated value (29 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 84%.n = 29
  • 7% of awards went to companies from abroad (366 awards with a known winner country). Sector average: 2%.n = 366

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Vebego Groen Participatie B.V.52024–2025
Het NIC32024–2026
Xonar22025
Janssen-Fritsen B.V. · Helmond22024–2026
Laeven Infra B.V.22024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

8
2024
14
2025
20
2026
42 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Tuesday, 12 January 2027 at 10:00

Tactics

When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 14 completed awards — not a statement about this procedure.)

This procedure allows 77 days between publication and deadline — typical in this country is 48 (median of 2,911 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In the Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,446 recorded awards) — mostly from Belgium, Germany, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TenderNed. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via TenderNed before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now