Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Sale of properties Singellaan and Poststraat Siddeburen - municipality Midden-Groningen

Verkoop locaties Singellaan en Poststraat Siddeburen - gemeente Midden-Groningen — original title

NLNetherlandsBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 16 November at 12:00 — 15 days left.
  2. You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The purpose of this open procedure is to arrive at the choice of a Buyer who is willing to purchase one or both plots of land and to realise the development(s) it proposes for its own account and risk in accordance with the principles of the Municipality. As a result of the implementation of the school program, several old school buildings, often with associated gymnasiums and / or playgroups, have become empty or will soon become empty. Some of the old school buildings have since been demolished, are being demolished in the autumn or are being rented out temporarily to various parties (including vacancy management). The release of a large number of locations in different cores of the municipality of Midden-Groningen has created a need to sell these locations in phases. To this end, the ‘Freedom of Locations’ programme was established, which aims to transform these locations. The program offers the opportunity to give an impulse to the housing challenge in the municipality of Midd

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published1 Jul 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45000000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (7 awards, most recently September 2025) — by that rhythm the next award was due around November 2025. The last award went to Hesco Bouw B.V.n = 7
  • 9% of this buyer's awards went to companies that had already won here before (71 awards since 2018, spread over 55 companies). 91% went to new names.n = 71 awards since 2018
  • The median procedure drew 3 bids (61 procedures with a bid count); 20% ended with a single bidder. Sector: median 4 bids.n = 61
  • The award came in at a median 89% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 84%.n = 10
  • 1% of awards went to companies from abroad (71 awards with a known winner country). Sector average: 2%.n = 71

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Overwijk Koffiesystemen Noord-Nederland B.V.32025
The Solutions Factory B.V.22023–2024
Intermont Assuradeuren B.V.22024
Nijha B.V.22025–2026
BAM Bouw en Techniek B.V.22024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2024
9
2025
3
2026
13 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 16 November at 12:00

Tactics

When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 7 completed awards — not a statement about this procedure.)

This procedure allows 138 days between publication and deadline — typical in this country is 48 (median of 2,911 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In the Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,446 recorded awards) — mostly from Belgium, Germany, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TenderNed. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via TenderNed before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now