Railway junction Brno, stage Heršpice and Personal railway station

Železniční uzel Brno, etapa Heršpice a Osobní nádraží — original title

CZCzechia · Praha

Your path to submission

  1. Deadline: 4 January 2027 at 09:00 — 64 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Předmět plnění veřejné zakázky: a) Spolupráce při zpracování Dokumentace EIA, zahrnující spolupráci a přípravu podkladů pro zpracovatele Dokumentace EIA uvedeného v čl. 4.15 ZTP, koordinaci technického návrhu s výstupy a doporučeními Dokumentace EIA a zapracování závěrů z procesu EIA do Projektové dokumentace pro povolení stavby dopravní infrastruktury (DPS). b) Zhotovení Projektové dokumentace pro povolení stavby dopravní infrastruktury (DPS) v režimu BIM, která specifikuje předmět Díla v takovém rozsahu, aby ji bylo možno projednat v řízení o povolení záměru, získat pravomocné povolení záměru (povolení stavby) dle zákona č. 283/2021 Sb., stavební zákon, ve znění pozdějších předpisů (dále jen „stavební zákon“), včetně Stanoviska oznámeného subjektu ve fázi vydání povolení záměru a činností koordinátora BOZP při práci na staveništi ve fázi přípravy včetně zpracování plánu BOZP na…

Show full description

… staveništi a manuálu údržby. c) Zpracování a podání žádosti o vydání povolení záměru dle stavebního zákona, včetně všech vyžadovaných podkladů, jejímž výsledkem bude vydání povolení záměru (povolení stavby). Dodavatel bude spolupracovat při vydání příslušných rozhodnutí do nabytí jejich právní moci. d) Zpracování Díla v režimu BIM a vytvoření Informačního modelu BIM dle Přílohy č. 11 Smlouvy o dílo s názvem BIM protokol, včetně všech jeho příloh. Informační model je součást Díla a bude zpracováván, projednávám a odevzdáván průběžně a společně s ostatními části Díla dle Harmonogramu plnění dle Přílohy č. 5 Smlouvy o dílo. e) Koordinační činnost dodavatele, jejíž náplní je koordinace této zakázky a zhotovitelů zakázek „Železniční uzel Brno, etapa Černovice“, „Železniční uzel Brno a etapa Židenice“. Cílem je zachování jednotné koncepce technického řešení a všech částí dokumentace. f) Zhotovení Aktualizace Záměru projektu (AZP) podle Pravidel přípravy a realizace akcí dopravní infrastruktury financovaných Státním fondem dopravní infrastruktury (dále jen „Pravidla MD“). Rozsah tohoto plnění si Objednatel vyhrazuje jako změnu závazku ze smlouvy v souladu s ustanovením § 100 odst. 1 ZZVZ. Plnění bude Zhotovitel realizovat na základě pokynu Objednatele při překročení předpokládaných investičních nákladů o 10 % anebo při zásadních změnách technického řešení stavby. g) Tvorba dat pro potřeby provozu GIS portálu (systém pro veřejnost), průběžná správa a aktualizace dat portálu na základě požadavků zadavatele, nebo připomínek veřejnosti. h) Výkon Dozoru projektanta při zhotovení PDPS. Bližší specifikace předmětu plnění veřejné zakázky je upravena v dalších částech zadávací dokumentace.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuevalue not published
Published30 Oct 2026
ProcedureOpen procedure
Contract period1 Mar 2027 → 29 Feb 2036

Type of service

71 · Architecture & engineering
CPV 71322000 · 71311230 · 71335000 · 71351730

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (292 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Tým dopravního inženýrství s.r.o.n = 292
  • 57% of this buyer's awards went to companies that had already won here before (2,762 awards since 2015, spread over 311 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 2,762 awards since 2015
  • The median procedure drew 2 bids (2,364 procedures with a bid count); 32% ended with a single bidder. Sector: median 4 bids.n = 2,364
  • The award came in at a median 89% of the estimated value (373 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 373
  • 16% of awards went to companies from abroad (2,762 awards with a known winner country). Sector average: 8%.n = 2,762

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In this buyer's last 276 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
AŽD Praha s.r.o.712022–2026
GJW Praha spol. s r.o.582022–2026
Chládek & Tintěra, a.s.552022–2026
Signalservis, a.s.542022–2026
Chládek a Tintěra, Pardubice a.s.462021–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

21
2022
249
2024
352
2025
140
2026
762 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday, 4 January 2027 at 09:00

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 276 completed awards — not a statement about this procedure.)

This procedure allows 66 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Czechia · Architecture & engineering, 456 contracts went to foreign companies over the last 3 years (of 16,225 recorded awards) — mostly from Germany, France, Austria.

Submission language: Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now