Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Drienovec – Šaca – Ľudvíkov dvor – reconstruction of the water supply pipe

Drienovec – Šaca – Ľudvíkov dvor – rekonštrukcia zásobného vodovodného potrubia — original title

SKSlovakia · Košice

Your path to submission

  1. Deadline: 2 December at 10:00 — 31 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Slovak, Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The construction in question is intended to reconstruct part of the existing Drienovec Rad I water supply pipe due to its obsolescence. Scope of construction modifications: The technical solution for reconstructing part of the Drienovec Rad I water supply pipe is designed as relining of the pipe using relining technology in its entirety, i.e. retracting the pipe of a smaller dimension into the original OC DN 700 pipe. PE100 D630x37,4 PN10 SDR 17 pipes of 1 900 m in length will be used for reconstructing the water supply pipe. The reconstruction of the water supply pipe will be carried out after sections of approximately 190 m in length by successive retraction of the pipe, which will be welded to the butt due to retraction. At the points of quarries and connections of individual sections, the pipe will be welded using electrofusion sleeves.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€1,061,974
Published30 Oct 2026
ProcedureOpen procedure
EU-fundedReserved for SMEs

Type of service

45 · Construction work
CPV 45231300 · 45232150 · 45112400

Clement What the numbers say about this buyer

  • The median procedure drew 2 bids (180 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 180
  • 53% of this buyer's awards went to companies that had already won here before (193 awards since 2018, spread over 49 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 193 awards since 2018
  • 9% of awards went to companies from abroad (193 awards with a known winner country). Sector average: 25%.n = 193
  • The award came in at a median 91% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 7
  • 99% of the bids received came from small and medium-sized enterprises (150 procedures with a bid mix). Sector: 79%.n = 150

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Arminius a. s.272024–2026
ENVIRONCENTRUM, s.r.o.162024–2026
JK SERVIS s.r.o.152024–2026
Marius Pedersen, a.s.82024–2026
ASUAN a.s.82024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

4
2024
2
2025
51
2026
57 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Wednesday 2 December at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,153 completed awards — not a statement about this procedure.)

This procedure allows 33 days between publication and deadline — typical in this country is 30 (median of 773 procedures). A normal window for this market.

Foreign bidders

In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.

Submission language: Slovak, Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Slovak, Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now