Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Reconstruction of the multipurpose sports hall in Dubnica nad Váhom

Rekonštrukcia viacúčelovej športovej haly v Dubnici nad Váhom — original title

SKSlovakia · Dubnica nad Váhom

Your path to submission

  1. Deadline: 4 November at 10:00 — 3 days left.
  2. You submit on ÚVO / EVO — not here and not by e-mail. ↗
  3. Offer and evidence in: Slovak, Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject-matter of the contract includes the reconstruction of the existing sports hall, including related demolition works, construction modifications and modernisation of the technical equipment of the building. The implementation includes, in particular, the reconstruction of the perimeter cladding and roof structure of the building, the modification of interior spaces, including changing rooms, sanitary facilities and stands, the implementation of a new sports floor, as well as the reconstruction and addition of technical wiring of the building. The subject of the contract also includes the implementation of a new heat source using a heat pump system, including the construction of drilled wells, well water distribution systems and related technological equipment. The scope and technical design of the building are defined in detail in the project documentation prepared by HajPo,…

Show full description

… s.r.o. and Ing. arch. Vlasta Illievová-Santa, and forms part of the tender documents and according to which the implementation will be carried out. The Contractor is obliged to ensure the realization of the work in accordance with the project documentation, applicable technical standards and legislation, including ensuring the delineation of utilities, carrying out the necessary tests and revisions, proper waste management and handing over the functional and operational work to the Customer. The contractor is obliged to ensure the implementation of all activities, works and measures resulting from the conditions specified in the building permit and from the binding opinions of the authorities concerned, by which the client as a builder is bound. Further details are provided in Part B.1 of the OPIS of the subject of the contract of these procurement documents and in the project documentation, which forms Annex 4 to the SR.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€8,876,989
Published29 Oct 2026
ProcedureOpen procedure
Contract period15 Sept 2026 → 30 Nov 2026
Place of performanceDubnica nad Váhom
EU-fundedReserved for SMEs

Type of service

45 · Construction work
CPV 45000000 · 45100000 · 45443000 · 45261100 · 45232141 · 45311000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 13 months (5 awards, most recently October 2026) — the next award is due around October 2027 by that rhythm. The last award went to BOISE s. r. o.n = 5
  • 5% of this buyer's awards went to companies that had already won here before (23 awards since 2018, spread over 3 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 23 awards since 2018
  • The median procedure drew 3 bids (17 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 17
  • 30% of awards went to companies from abroad (23 awards with a known winner country). Sector average: 25%.n = 23
  • Across 3 procedures with structured selection criteria, this buyer most often required: Environmental management (3 of 3), References: works (3 of 3), Staff qualifications (3 of 3), Financial ratio required (3 of 3).n = 3

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ŠPORTFINAL s. r. o.22024
DAG SLOVAKIA, a. s.12025
BOISE s. r. o.12026
H B H , a.s.12025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2024
5
2025
12
2026
19 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Wednesday 4 November at 10:00

Tactics

When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 5 completed awards — not a statement about this procedure.)

This procedure allows 6 days between publication and deadline — typical in this country is 30 (median of 773 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.

Submission language: Slovak, Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
Bids are submitted on ÚVO / EVO — TED carries the same notice, usually with the more detailed specification. Read both.
TEDNoticeÚVO / EVOSubmission portal
Put together the evidence — in Slovak, Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now